NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 44/AMTRAK'S West Side Connection
Document / 5 pages

AMTRAK'S West Side Connection

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000165700–000165704
Page image
Scanned page image, NYC-WTC_000165700
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

cc: DiMartino Farag D, Smith

■"^'Suspense CP:lP »• • Dispatebed JUL U 1988 iureauofHeavyConrt-’uction I Mail Room

Commissioner

J Lily J'}, .1988

Mr. A.E. .Shaw, Jr. P.E., Director of Engineering, Track & Structures ’ National Railroad Passenger Corporation 200 Market Street Philadelphia, PA 19J 03

RE: . (Vest Side Connection, Grading Drainage and Tract,- Construction from IVc.st 37th Street to Harlem River, Borough of Manhattan

Dear Mr. Shaw:

This is in reply to your submittal of contract plans with a letter dated June 3, 1988 regarding the above referenced^prgj^t. Please be advised of the following comments of this department:

1. On sheet No. D-1, drop pipe manhole details for proposed manhole No. 13 do not conform with NYCDEP Sewer Design Standards. A copy of sewer design standards is enclosed for your reference.

2. On sheet No. D-6, details for proposed manhole No. 14 do not conform with NYCDEP Sewer Design Standards. Use new 27” diameter NYCDEP standard manhole cover and frame in lieu of existing 24" diameter manhole cover and frame. Use a 4'-0” X 4'-0" chimney instead of a 5'-0" X 4*-0" chimney for this manhole.

3. j4s per the comment. No. 3 of our letter doted /torch 21, 1988 and comment No. 2 above submit structural calculations for proposed manhole No. 14 and for a structural cap on an existing manhole shown on sheet No. D-6.

For our approval please siibniit three (3) complete sets of contrecl. rioamients revised in conformance with the above comments, and comments iniU: re the roclosed plans.

ENCLOSURE. Vci v truly sv.urs.

'MAGDI FAhAL.. P^E., CHIEF Divisinu of Eewcv Repuletious Control, liurenii of Sewers

NYC-\/\/TC_000165700

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165700Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

DEP comments on drainage plans, Oct 1983 · Box DEP Box 44

NYC-WTC_000165844

Department of Environmental Protection review comments on 30% plan drawings requesting key plans, legends, and distance measurements.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.962

machine-extracted · confidence unavailable · Check page ↗
DEP response to 95% plan submittal, Dec 1983 · Box DEP Box 44

NYC-WTC_000165824

Department of Environmental Protection letter acknowledging receipt of 95% plans and referring comments previously sent to the consulting engineers.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165687 · Box DEP Box 44

Letter from DEP Office of Legal Counsel enclosing an executed agreement regarding a sewer matter near 11th Avenue and West 33rd Street.

Filed in the same folder

Compare copies and versions →