NYC 9/11 Public PortalDocum^
DISPATCHED )
f ' /
AUG 01 W
WATER POLLUTION CONTROL
MAIL ROOM
July 28, 1983
co
co 5
Mr. James G. Carlock, P.E., 52
Project Administrator
World Trade Center Planning
ro
358
Port Authority of New York & New Jersey
One World Trade Center 52
New York, NY 10048 PS’
C3
RE; WTC 776.00 Church Street Underpass*
at Dey Street-New Escalators, Pre-^
liminary Drawings, Borough of
Manhattan
Dear Mr. Carlock;
We have completed our review of the preliminary contract drawings submitted with
your letter of June 21, 1983. In keeping with our meeting of July 21, 1983, the
following point by point discussion should clarify the comments in the marked-up
set of plans we are returning.
The submitted plans did not show provisions for support or replacement of the
3’-6" X 2’-4" sewer which runs along the east wall of the BMT Subway in Church
Street. The affected area lies approximately between the north and south
building lines of Dey Street. Sewer Record Drawing R457, Route 5, Section 1
dated June 19, 1916 shows three (3) distinct types of construction within these
limits. Attached are xerox copies of pertinent sections of R457 for your in
formation.
As we discussed in the July 21, . meeting it does not seem likely that the brick
and concrete sections of sewer can be supported during the proposed construction.,.
i.e., underpinning of Citibank, driving of soldier beams and temporary support
of the subway roof at the escalator opening.
-cont-
1
NYC-WTC_000165556
OCR can misread numbers and units. Confirm readings against the page image before using them.