NYC 9/11 Public Portal Document
Mr. Frederick Novotny, P.E. 72/ January 29, 1982
4. The drawings have been revised to eliminate any interference of
other utility lines with sewers. As mentioned above, complete
structural details of Manholes No. 1 and 2 will be included in
the forthcoming Contract Drawings which will be submitted for your
approval.
5. General Note #7 on Drawing No. C-3 confirms that there are no house
sewer connections. If any are found, they will be maintained and
if disturbed, they will be reconnected.
6. The draxjings have been revised to clearly differentiate between
existing, new,rerouted or removed work.
7. Drawing No. WTC-C2-81 has been revised to show the 6'' drain as a
"6" Condensation Drain". This is not steam condensate, but rather
condensation formed on the inside of the cold steel casing which
protects the insulation. It is below the maximum 150°F temperature
limit you specified.
Three (3) complete sets of the above revised drawings are hereby
transmitted for your further review and approval. If you or your staff need
any assistance, please contact me at 466-4106.
As you may know, this project will be undertaken by the Port Autho
rity at the request of the City of New York. Nevertheless, we are anxious
to progress it and would appreciate any consideration available to you to
expedite it. Please let me know if I can help.
Sincerely,
i><James G. Car lock, P.E.
Project Administrator
World Trade Center Planning
NYC-WTC_000165540
OCR can misread numbers and units. Confirm readings against the page image before using them.