NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/U.S.S. Intrepid Museum - Pier 86 W. 46 St. DRAWINGS
Document / 4 pages

DEP letter re: SD 152 permit application for Pier 86

Machine-extracted title · confidence 95%

March 2, 1982 DEP letter responding to a building structure proposal over an existing sewer outfall at Pier 86.

NYC-WTC_000165484–000165487

Folder label: “U.S.S. Intrepid Museum - Pier 86 W. 46 St. DRAWINGS

Page image
Scanned page image, NYC-WTC_000165484
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Copies to: Joseph Medl^^S Luk Sun Wong Mr. Heimbush Dept, of Po^f 8 Terminals Clark 5 Rap^j^ Inc. Battery Maritime Building 215 LexingtwrAvenue New York, N.Y. 10004 New York, N.Y. 10006

March 2, 1982

John T. Dwyer Re: Interpid Museum Project, Consentini Associates Pier 86 at W.46th Street 2 Pennsylvania Plaza New York, N.Y. 10121 BOROUGH OF MANHATTAN

Dear Mr. Dwyer: This is in reply to your letter of February 18, 1982 wherein SD 152 applications and related site plans for the above project v/ore sub­ mitted to this office for processing. Our examinaiton of your plans indicates that a building structure is to be erected within the filled-in portion of Pier 86 directly over an existing double barrel 6*-6" x 8*-6” sewer outfall. Such a structure, could have an advezse affect on our maintenance or reconstruct­ ion capabilities of the sewer. Since your drawings do not provide any details as. to the type of structure or the method of installation, it is impossible to access the extent of the impact on our sewer or to make any determination as to the acceptability of this proposal. It is requested that you submit detailed drawings indicating the following: 1. Type of building structure. 2. Location of footings (both horizontatlly and vertically with respect to the sewer) or other foundation structures over the sewer. 3. Net vertical cliearance (if any) from the building to ground surface over th^ sewer. Please note that uo further processing of your house connection application can b i performed until the aforementioned drawings have been submitted to and reviewed by this office. cc: DiMartino Very truly yours. Novotny^ Faraf****^ Uriko/Sirico I Lau MAGDI F:\RAG, P.E., ACTING CHIEF, Tartaro Div. Sewer Regulation 5 Control Suspense Bureau of Sewers NL: im

NYC-WTC_000165484

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165484Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →