NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/Proposed Sewer Relocation in Conjunction with new Subway Interconnection 3RD AVE AT 60TH STREET DRAWINGS 9/29/81-138/3
Document / 2 pages

DEP request for revised plans, 3rd Avenue at 60th St.,

Machine-extracted title · confidence 90%

Letter requesting complete hydraulic analysis and detailed drainage plans for a sewer relocation project.

NYC-WTC_000165455–000165456

Folder label: “Proposed Sewer Relocation in Conjunction with new Subway Interconnection 3RD AVE AT 60TH STREET DRAWINGS 9/29/81-138/3

Page image
Scanned page image, NYC-WTC_000165455
OCR text

OCR status: ok · source: pdftotext

Document

* 231.020

December 15, 19R1

?lr. Gasper Aluczo, P.E. KE: Proposed Sewer Relocation Consentini Associates in Conjunction with New Consulting Pnginsors Subway Connection at 3rd 2 Pennsylvania Plaza Avenue and 60th Street, Mew York, MY lOi^l Borough of Manhattan Dear iir. Alucao: This is in reference to your subnission of preliminary plans with a letter dated September 29, 1931 for ths above referenced project. As you have been advised through a previous telephone conversation, in order for this department to perform a complete revievz, three f3) complete sets of revised plans should be submitted, giving full details of all proposed drainage work and thei r relationship to existing structures, sewers and drainage facilities in the contract. area. Your revised submission should include the fallowing items: 1) Complete hydraulic analysis verifying the adequacy of the proposed replacement pipe to acco™modA't^ the existing upstream flow with no adverse effects on the downstream system. Said analysis must include plan and longitudinal profile viexzs of the new piping and a comparison of the hydraulic grade lines for the existing and new piping. 2) A section view of the new subway interconnection in a NE/2X'/ direction. 3) A means of acconmodatinq the street drainage at 60th Street and 3rd Avenue. 4) A modification to the now sewer alignment such that the pipe does not traverse private property at the northeast corner of 3rd Avenue and 60th Street. Please note that if this realignmont is rjot physically possible due to the elevations of the new substructure, a permanent sewer easement must be established about the portion of pipe in private property.

-cont-

NYC-WTC_000165455

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165455Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →