• 11th Avenue.
Invert at 33rd street at west of 33rd
street.
. Satisfy all the house connections along
33 & 34th streets not to be flooded.
. Hydraulic gradient satisfies the MH cover
elevation.
At this point, this request cannot be met for
the following reasons:
Will change the siphon cross sections
(reduced)
. Will force to lower the profile. This
cannot be done because of the controlling
Inverts at MH #1, #2, & #3.
It will increase the velocity which will
raise the hydraulic gradient.
. It will cause flooding at critical house
connections and MHs. The proposed cross
section and design was reviewed by BOS*
staff in several different meetings.
15. a) Will do drawings. S-33, 34, 35,
and 36.
b) Guide lines for design of chambers is
attached to Hydraulic calculations. The
selected radius satisfies all of the
reguirements. See calculations which are
stamped by a P.E.
16. a) Standard practice of R bar detailing with
proper dowels are shown.
b) All necessary Information and relevant
details and bar placements are shown on
Dwgs. S-93 and 94.
c) Plow Redirection Chamber is very close to
the adjacent Plow Distribution Chamber
and new chamber (MH) #3 from where access
can be provided.
17. a) Dwgs S-33 thru S-36 have more details
(sections a plans) than the sample given.
There are 26 sections taken to cover 180
feet long siphon which should be adaguate.
NYC-WTC_000165339