All Other items are shown on S-32.
We are showing sll ’'ocessary informat'’on,
our scale is slightly different but
presentation is clear, constructable, and
well detailed drawings.
9. All construction joints shown have key and
water stop. The joints are needed for the
following reasons:
To eliminate cracking associated with
long concrete pouring.
. To maintain quality control during the ।
construction to achieve the quality end
product.
This is the accepted method for all
concrete construction. C.J. provides
options for contractor to alternate the
pour sequence to eliminate shrinkage.
Expansion joints are provided because
of the proximity to the surface and also
recommended by ACI 350 R-77 Sect. 2.8 &
Page 350 R-9.
10. Will comply. Will be shown on Dwg. S-36.
11. By AMTRAK. (Legal Dept.’s are discussing and
working on this subject.)
12. Will do. See Dwg. C-11.
13. a) It is done. The l‘-0" collar is the
integral part of the MH. See Sect. B on
Dwg S-36.
b) Exact make up of the sewer not known. If
it is not the same as on 34th Street,
contractor will identify. A note will be
added to ask the contractor to identify
and describe it for as built Dwgs.
See Dwg. S-36.
c) Will do. See Sec. E on Dwg. S-35.
14. This is the first time this request is made.
It has to be recognized that the siphon design
is unique in which following four major points
have to be satisfied.
Inverts at 33 & 34th streets at east of