Contract LT-246 plans for 39th Street water line replacement

Machine-extracted title · confidence 90%

Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.

NYC-WTC_000165271–000165288

Folder label: “LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN

Page image
Scanned page image, NYC-WTC_000165287
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

( 2.04 CEMENT MORTAR LINING FOR DUCTILE IRON PIPE

Shall conform to the requirements of ANSI A21.4 except that the thickness of the lining shall be twice that specified in Section 4-10.1.

PART 3 - EXECUTION

3.01 EXCAVATION AND BACKFILL

A. Verify that excavation and backfill is performed in accord­ ance with requirements of Section entitled "Excavation, Backfill and Pavement Restoration" and so as to provide a minimum of 4' cover over pipe unless otherwise shown on Contract Drawings.

B. Before placing pipe in trench finish bottom of trench by hand and compact so as to support pipe for its entire length.

C. If water enters trench, remove it and suspend operations until a method for preventing the accumulation of water in the bottom of trench is approved by the Engineer, and is effee ted. f D. Where ground water exists in trench at or above the invert level such that in the opinion of the Engineer, laying of pipe as required by B and C above is impractical, use of blocking in laying of pipe will be permitted.

3.02 PIPE RESTRAINT

TYPE II AND TYPE III - PIPE RODDING AND BANDING

A. Rod and band joints where and in accordance with details shown on Contract Drawings.

B. Install bands with full bearing against pipe bells.

C. Do not install bands which depend upon friction between pipe or fitting and band.

D. Where no bell is available at a joint requiring rodding, ex­ tend rods to next bell, and where such rods are in excess of 6' long, provide intermediate supporting bands at intervals of 6' or less.

/5'

NYC-WTC_000165287

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165287Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165268 · Box DEP Box 44

A cover sheet or index page for documents related to the West 39th Street contract involving the replacement of infrastructure.

Filed in the same folder

NYC-WTC_000165112 · Box DEP Box 44

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

Similar indexed content

Compare copies and versions →