NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/DEP Box 44/LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN
Document / 18 pages

Contract LT-246 plans for 39th Street water line replacement

Machine-extracted title · confidence 90%

Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.

NYC-WTC_000165271–000165288

Folder label: “LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN”

Page image
Scanned page image, NYC-WTC_000165288
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

3.03 OPERATION OF VALVES

A. Do not operate existing valves.

B. Engineer will operate valves as required.

3.05 COATING OF PIPE AND APPURTENANCES

A. Before backfilling, apply two heavy brush coats of bitumas­ tic paint to all rods, bands, nuts, bolts, washers and other appurtenances.

B. Prepare surfaces and apply coating in accordance with manu­ facturer's printed instructions.

NYC-WTC_000165288

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165288Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165268 · Box DEP Box 44

Department of Environmental Protection letter confirming no impact on the sewer system for proposed work at the Lincoln Tunnel.

Filed in the same folder