NYC 9/11 Public Portal Document
SECTION 02082
I. Water Atomizer: Powered air-misting device, equipped with a ground fault interrupter
and equipped to operate continuously. Water atomizer device shall be the “Tri-Jet DS”,
No. 6228, as manufactured by Eogmaster Corp, of Hialeah, Elorida, or EM 490 Portable
Electrical/Airless Sprayer as manufactured by Graco, Inc., P.O. Box 1441, Minneapolis,
MN 55440-1444.
J. Brushes: All brushes shall have nylon bristles. Wire brushes are excluded from use due to
their potential to shred asbestos fibers into small, fine fibers. Wire brushes maybe used
for cleaning pipe joints within glove-bags upon written approval of the Resident
Engineer.
K. Hand Power Tools: shall be equipped with HEPA-filtered local exhaust ventilation if
used to drill, cut into or otherwise disturb ACM.
L. Other Tools and Equipment: Contractor shall provide other suitable tools for the
stripping, removal, encapsulation, and disposal activities including but not limited to:
hand-held scrapers, sponges, rounded-edge shovels, brooms, and carts.
M. Eans and Leaf Blower: Provide Leaf Blower (one leaf blower per floor) and one 20-inch
diameter fans for each 10,000 cubic feet of Work Area volume to be used for aggressive
sampling technique for clearance air testing.
N. Eire Extinguishers: Provide type “A” fire extinguishers for temporary offices and similar
spaces where there is minimal danger of electrical or grease-oil-flammable liquid fires. In
other areas, provide type “ABC” dry chemical extinguishers of NFPA recommended
types for the exposure in each case. All fire extinguishers shall comply with the
applicable recommendations of NFPA Standard 10, “Standard For Portable
Extinguishers.” Provide a minimum of four fire extinguishers in each Work Area; one in
the equipment room of the decontamination unit, one outside the Work Area in the clean
room or directly outside same, and two fire extinguishers where they are most effective
for their intended purpose. Do not exceed seventy-five feet between fire extinguishers
within the Work Area.
O. Eirst Aid Kits: Contractor shall maintain adequately stocked first aid kits in the clean
rooms of the decontamination units and within Work Areas. The first aid kit shall be
approved by a licensed physician for the work to be performed under this Contract.
P. Water Service:
1. Temporary Water Service Connection: All connections to the Facilities water
system shall include back flow protection. Valves shall be temperature and
pressure rated for operation of the temperature and pressures encountered. After
completion of use, connections and fittings shall be removed without damage or
alteration to existing water piping, and equipment. Leaking or dripping
fittings/valves shall be repaired and or replaced as required.
2. Water Hoses: Employ new heavy-duty abrasion-resistant hoses with a pressure
rating greater than the maximum pressure of the water distribution system to
provide water into each Work Area and to each Decontamination Enclosure Unit.
02082-57
CITY_21 MCI 00_014563830
NYC-WTC_000454630
OCR can misread numbers and units. Confirm readings against the page image before using them.