SECTION 02082
Provide fittings as required for connection to existing wall hydrants or spouts, as
well as temporary water heating equipment, branch piping, showers shut-off
nozzles and equipment.
3. Water Heater: Provide UE rated 40-gallon electric water heaters to supply hot
water for Personal Decontamination Enclosure System Shower. Activate from 30
Amp Circuit breakers located within the Decontamination Enclosure subpanel.
Provide relief valve compatible with water heater operations, pipe relief valve
down to drip pan at floor level with type 'L' copper piping. Drip pans shall be 6-
inch deep and securely fastened to water heater. Wiring of the water heater shall
comply with NEMA, NECA, and UE standards.
Q. Electrical Service:
1. General: Comply with applicable NEMA, NECA and UE standards and governing
regulations for materials and layout of temporary electric service.
9 Temporary Power: Provide service to decontamination unit subpanel with minimum 60
AMP, two pole circuit breaker or fused disconnect connected to the building's main
distribution panel. Subpanel and disconnect shall be sized and equipped to accommodate
all electrical equipment required for completion of the work.
3. Voltage Differences: Provide identification warning signs at power outlets that are other
than 110-120 volt power. Provide polarized outlets for plug-in type outlets, to prevent
insertion of 110-120 volt plugs into higher voltage outlets. Dry type transformers shall be
provided where required to provide voltages necessary for work operations.
4. Ground Fault Protection: Equip all circuits for any purpose entering Work Area with
ground fault circuit interrupters (GFCI). Locate GFCIs exterior to Work Area so that all
circuits are protected prior to entry to Work Area. Provide circuit breaker type ground
fault circuit interrupters (GFCI) equipped with test button and reset switch for all circuits
to be used for any purpose in Work Area, decontamination units, exterior, or as otherwise
required by NEC, OSHA or other authority. Locate in panel exterior to Work Area.
5. Power Distribution System: Provide circuits of adequate size and proper characteristics
for each use. In general run wiring overhead, and rise vertically where wiring will be
least subject to damage from operations.
6. Temporary Wiring: Tn the Work Area shall be type UF non-metallic sheathed cable
located overhead and exposed for surveillance. Provide liquid tight enclosures or boxes
for all wiring devices. Do not wire temporary lighting with plain, exposed (insulated)
electrical conductors.
7. Electrical Power Cords: Use only grounded extension cords; use hard service cords
where exposed to traffic and abrasion. Use single lengths of cords only.
8. Temporary Lighting: All lighting within the Work Area shall be liquid and moisture
proof and designed for the use intended.
a) Provide sufficient temporary lighting to ensure proper workmanship everywhere;
02082-58
CITY_21 MCI 00_014563831
NYC-WTC_000454631