NYC 9/11 Public Portal Document
Cleaning Procedures For 114 Liberty Street (4) The asbestos contractor shall provide sufficient equipment and experienced personnel to complete work area preparation and cleaning activities of the building interiors within three (3) weeks. Water/electrical supply shall be provided by residents/owner. At least one asbestos supervisor shall be present per work area during the duration of the clean-up activities. Work shall be performed 24 hours per day, seven (7) days per week.
(5) Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this clean-up activity. (6) Warning signs shall be posted at the approach to each work area. (7) A separate worker and waste decontamination enclosure system in compliance with Title 15, Chapter 1 of the RCNY shall be installed at the entrance to each work area. More than one work area may be established. Work shall proceed from the 12^’’ floor down to the first floor. The use of a remote decontamination enclosure system is acceptable. Prior approval must be received from the NYCDEP for decontamination enclosure system placement and phasing of clean-up activities, if required. (8) An entry/exit log in compliance with the requirements set forth in Title 15, Chapter 1 of the RCNY shall be maintained in the clean room. The site supervisor shall maintain an activity log. (9) Initially, the interior of the elevator shaft, including the top of the elevator car and the elevator pit, shall be HEPA vacuumed and wet wiped to allow for the use of the elevator during the clean up. Once the clean up throughout the building is complete, the elevator shaft, including the top of the elevator car and the elevator pit, shall be re-cleaned prior to clearance air monitoring. (10) Isolation barrier locations (i.e.: wall or ceiling penetrations, windows, vents, doors, etc.) shall be HEPA vacuumed and wet wiped prior to installing two-layers of 6-mil polyethylene sheeting and sealed with tape. Window wells, ledges, guards, etc., that are accessible from the interior shall be cleaned. (11) Negative pressure ventilation equipment (air filtration devices -AFDs) shall be installed and operated continuously 24 hours per day during all clean-up activities. Equipment shall run continuously until clearance air monitoring. A minimum of one air change every 15 minutes shall be provided. When ducting to the outside is not possible, a second negative air unit compatible with the primary unit may be coimected in series. (12) Dropped ceilings at functional air plenums shall be removed. Interior and perimeter walls shall be removed to access the interstitial spaces for cleaning. Only one side of each wall shall be removed to access the space. The back of walls scheduled to remain (i.e. tiled bathroom walls) shall be wet wiped and HEPA-vacuumed. For specific information regarding the location of walls to be removed, please refer to the plans. (13) The HVAC Systems and associated ductwork shall be removed and disposed in accordance with applicable rules and regulations. (14) All debris and/or dust shall be misted and double bagged. Accumulation of water is prohibited. Water misting shall be sufficient to wet the material without water accumulations. Caution shall be 2 of 5
NYC-WTC_000155643
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
14 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100690
Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
14 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102605
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107379
Formal request by a resident for the Department of Environmental Protection to perform cleaning and monitoring work at their apartment.
12 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107535
Resident request for DEP to perform cleaning and monitoring work at an apartment in Manhattan.
13 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 4 pages · confidence 0.00 · verify page 2
- 114 LIHERTV STREET · 2 pages · confidence 0.70 · verify page 11
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Report documenting an asbestos inspection conducted at 114 Liberty Street by ETS Construction.
Cited alongside this record in an Ask answer
NYC-WTC_000102579
A fax cover sheet from ETS Contracting Inc. dated March 17, 2003, transmitting documents related to the WTC site.
Cited alongside this record in an Ask answer
NYC-WTC_000102588
A fax cover sheet from ETS Contracting Inc. dated March 4, 2003, transmitting documents related to the WTC site.
Cited alongside this record in an Ask answer
NYC-WTC_000152966
Office of the Comptroller grants written approval for an emergency procurement to clean the interior of 114 Liberty Street.
Cited alongside this record in an Ask answer
NYC-WTC_000153530
DEP memo outlines proposed interior cleaning procedures for 114 Liberty Street following WTC collapse damage.
Cited alongside this record in an Ask answer