NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165208
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park City Commercial Center Bldg. 'B' WTC River Water Intake System Relocations

Abbreviations ANSI American National Standard Institute, Inc. ASME American Society of Mechanical Engineers ASTM American Society for Testing Materials AWWA American Water Works Association PANYNJ Port Authority of New York'anti New Jersey IEEE Institute of Electric & Electronic Engineers B. Fees 1. Pay all required fees. 2. Pay royalties or fees required in connection with the use of patented devices and systems. 1.12 SHOP DRAWINGS A. Prepare and submit detailed shop drawings for electri-- cal work and other distribution services. B. The work described in any shop, drawing submission shell! be carefully checked for all clearances (includ­ ing those required for maintenance and servicing) , field conditions, maintenance of architectural condi­ tions and proper coordination with all trades on the job. Each submitted shop drawing shall include a cer- tif ication that all related job conditions have been checked and that no conflict exists. C. All drawings shall be submitted sufficiently in ad­ vance of field requirements to allow i?mple time for checking. All submittals shall be complete and con­ tain all required and detailed information. Shop drawings with multiple parts shall 'oe submitted as a package. D. If submittals differ from the Contract Document re- guirements, make specific mention of such difference in a letter of transmittal, with request for substi­ tution, together with reasons for same. E. Approval of any submitted data or shop drawings for material, equipment apparatus, devices, arrangement

Electrical Special Conditions NYC-WTC_000165208

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165208Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →