Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165209
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park City Commercial Center Bldg. ‘B' WTC River Water Intake System Relocations

7. Single line and plan drawings for temporary power. 1.13 CONNECTIONS WITH EXISTING SITE SYSTEMS A. Make any connections of the proposed systems to exist­ ing systems with a minimum amount of disturbance to the existing lines. B. Make all connections to existing lines in accordance with the requirements of the Port Authority of New York and New Jersey. C. Replace or reconstruct at no additional cost to the Owner any existing equipmnet or structure which is damaged while making connections to it. 1.14 GUARANTEE A. The General Conditions are amended to include the fol­ lowing : 1. The Subcontractor shall submit a single guarantee stating that all portions of the work are in ac­ cordance with contract requirements. Guarantee all work against faulty and improper material and workmanship for a period of five (5) years from date of final acceptance by the Contractor, ex­ cept that where guarantees or warranties for longer terms are specified herein, such longer term to apply. Within 24 hours after notifica­ tion, correct any deficiencies which occur during the guarantee period at no additional cost to Contractor, all to the satisfaction of the Con­ tractor . 1.15 UNIT PRICES A. Stare and hold firm for the duration of the construc­ tion contract, unit prices for the following items. Reflect in the unit price costs for the addition as well as the deletion of each item including profit, overhead, and insurance of each trade involved. Spe­ cifically reflect in the unit price the final price of the installed and operating item to the Owner, in full accordance with plans, specifications and Contract Documents. Prices shall include all labor and mate- rial miscellaneous appurtenances etc. for equipment fully installed in place.

Electr ical Special Conditions NYC-WTC_000165209

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165209Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →