Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165166
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

BatterywRrk City Commercial Center Bldg. 'B' WTC River Water Intake System Relocations

office of Battery Park City Authority, 40 Rector Street, New York, New York 10006. B. Additional Information Additional drawings may be available for inspection purposes only, at the office of the City of New York, Department of Ports and Terminals at South Street, New York, and at other government agencies. 1’03 COORDINATION OF WORK A. The mechanical drawings show the arrangement of piping and appurtenances. Follow these drawings as closely as the actual construction and the work of other trades will permit. Conform the mechanical work to the requirements shown on the drawings. Provide off­ sets, fittings, and accessories which may be required but not shown on the drawings. Coordinate the site, structural and finish ground conditions affecting the work. B. Carefully check space requirements with other trades to insure that all material can be installed in the spaces allotted thereto. C. The Subcontractor shall transmit to other trades, all information required for work to be provided under their respective Sections, in ample time for installa­ tion. D. Wherever work interconnects with work of other trades, coordinate with other trades to insure that a3..1. trades have the information necessary so that they may prop­ erly install all the necessary connections and equip­ ment. E. Provide required supports for, piping and equipment, so that loading will not exceed allowable loadings of structures. F. Examine and compare the contract drawings and specifi­ cations with the drawings and specifications of other trades, and report any discrepancies between them to the Contractor and obtain from him written instruc­ tions for necessary changes. Coordinate the work of other trades with the mechanical work. Before instal­ lation, take proper provisions to avoid interferences

Mechanical Special Conditions 15010-5

NYC-WTC_000165166

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165166Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →