WTC River Water Intake
System Relocations
and layout shall not relieve Subcontractor from re
sponsibility of furnishing same of proper dimensions
and weight, capacities, sizes, quantity, quality and
installation details to efficiently perform the re
quirements and intent of the Contract. Such approval
shall not relieve the Subcontractor from responsibili
ty for errors, omissions or inadequacies of any sort
on submitted data or shop drawings.
F. Each shop drawing shall contain job title and refer
ence to the applicable drawing and specification arti
cle.
G. Within fifteen (15) days after award of Contract, sub
mit for approval, a list of all material and equipment
manufacturers whose products are proposed,, as well, as
names of all Subcontractors whom this Trade proposes
to employ.
K. Within three (3) weeks after award of Contract, submit
a list of all shop drawings which will be submitted in
the course of the project. List to show disposition
of each item, including date of submission, approval,
and the like. List to be kept up-to-date throughout
entire construction period.
I. Submit shop drawings and manufacturer's data for the
following items in accordance with the Contract Docu
ments:
1. Coordinated, detailed shop layout drawings of all
services and distribution systems, including
plans, profiles and sections.
2. Location and size of related piles, concrete
platforms, manholes, and other foundaticns and
supports.
3. Schedule of ducts and fittings, materials and
application.
4. Details of splices, elbows, manholes, connections
to existing duct runs, and miscellaneous appur
tenances.
5. Corrosion protective coatings.
6. Other shop drawings and submitt<als as requested
within the specifications.
Electr ical
Conditions
Special ___________