Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165187
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Batter.^B»ark City Commercial Center Bldg. ’B" WTC River Water Intake System Relocations

tests are to be observed by Contractor and the Port Authority of New York and New Jersey. J D. Maintain a log book of all tests showing dates, per­ sonnel, observers’ initials, etc. E. Be responsible for any damage resulting from failure of items under test. F. Examine all pipe for defects before laying and no defective cr damaged pipe shall be laid. G. If the inspection of the completed system or any part thereof shows any structure, pipe, joint, or any other part of the system which is defective, remove and replace or repair the defective work as directed at no expense to the Contractor. H. Test entire pipe installation prior to connection to existing systems. Subsequent to final connections tests shall be made on the system as a whole as direc­ ted. I. Provide and operate all test equipment and apparatus required for the com.plete testing and inspection of all systems at such time and locations as may be di­ rected by the Contractor and/or by the authorities having jurisdiction. J. Correct defects which develop from testing, and retest system. K. Conduct tests of sufficient duration to permit inspec­ tion of all joints and other areas where leaks might occur. L. When freezing is a hasard, take all precautions neces­ sary to prevent damage. Correct any damage that re­ sults due to freezing at no expense to the Contractor. M. Subcontractors shall give a minimum of seven (7) days notice to the Contractor of time, date and place when any portion of the work is ready to be tested, ex­ amined and/or inspected.

Pipe Testing, Examinations And Inspections 15040-2

NYC-WTC_000165187

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165187Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →