NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165186
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery^irk City ComraercSR. Center Bldg. ’B” ^TTC River Water Intake System Relocations

SECTION 15040 PIPE TESTININATIONS AND INSPECTIONS PART I - GENERAL A. Descciption 1. The work covered by this division of the specifi­ cations includes the construction described in­ cluding all labor necessary to perform and com­ plete such construction, all materials and equip­ ment incorporated or to be incorporated in such construction and all services, facilities, tools and equipment necessary or used to perform and complete such construction. 2. Work included: The work of this section includes but is not limited to the following: a. Hydrostatic pressure and leak testing of reinforced concrete pipe and 2O"2f pre­ stressed concrete cylinder pipe. b. Temporary pips connections, pipe caps, tees, valves. c. Testing equipment and labor. 3. Related work included in this division but speci­ fied elsewhere: a. Reinforced concrete pipe specifications. Section 15020 b. Prestressed concrete cylinder pipe specifi- catione. Section 15030 B. Submittals 1. Submit written testing procedures for each line test including pipe capping details. 2. Submit certified test reports of all tests. C. Perform preliminary tests and repair all leaks before notifying the Contractor of final tests. All final

Pipe Testing, Examinations And Inspections 15040-1

NYC-WTC_000165186

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165186Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →