Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165185
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery *k City • Commercial Center Bldg. ’B' WTC River Water Intake System Relocations

E. Care shall be taken to coordinate excavation to a^ point not below design pipe grade. Material excavated below adopted grade shall be replaced by material which meets with the approval of the Engineer, without any additional payment. F. Where foundation conditions so require, the pipe shall be laid on screened gravel or broken stone. G. Immediately after the pipe is brought to final position, it shall be thoroughly secured and properly bedded, and ample support shall be provided to prevent settlement or distur­ bances. H. Pipe shall be thoroughly cleaned and ample precautions shall be taken to prevent entrance of dirt and debris into the pipe after laying. Exposed ends of the pipe line shall be provided with temporary plugs or covers. I. Precautions shall be taken by the subcontractor to guard against flotation of the pipe line after it is laid. J. Supervise backfilling of trenches in accordance with manu­ facturer’s requirements. K. The entire installation shall be under the supervision and approval of a certified manufacturers representative. Ob- tain manufacturers written certification of approved in~ stallation at the completion of each phase of construction including pipe testing. L. Run piping as shown on drawing, free of traps. M. Adjust location of pipes to accommodate the work to prevent interferences, both anticipated and encountered. Determine the location and exact route of each pipe prior to construc­ tion of fabrication.

SND OF SECTION

Prestressed Concrete Cylinder Pipe 15030-5

NYC-WTC_000165185

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165185Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →