Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165172
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery ^^rk City Commercial Center Bldg. 'B' |r

WTC River Water Intake System Relocations

6. Corrosion protective coatings. 7. Other shop drawings and submittals as requested within the specifications. 1.13 CONNECTIONS WITH EXISTING SITE SYSTEMS A. Make any connections of the proposed systems to exist­ ing systems with a minimum amount of disturbance to the existing lines. B, Make connections to existing systems watertight and without interrupting flow unless permission is ob­ tained from the Owner and the interruption is made at the Owner's schedule. C. Make all connections to existing lines in accordance with the requirements of the Port Authority of New York and New Jersey. D. Replace or reconstruct at no additional cost to the Owner any existing pipe line or structure which is damaged while making connections to it. 1.14 GUARANTEE A. The General Conditions are amended to include the following: 1. The Subcontractor shall submit a single guarantee stating that all portions of the work are in accordance with contract requirements. Guarantee all work against faulty and improper material and workmanship for a period of five (5) years from date of final acceptance by the Contractor, ex­ cept that where guarantees or warranties for longer terms are specified herein, such longer term to apply. Within 24 hours after notifica­ tion, correct any deficiencies which occur during the guarantee period at no additional cost to Contractor, all to the satisfaction of the Con­ tractor. 2. Be responsible for all leaks in all pipes for a period of five (5) years from date of acceptance of work under this Contract. Repair at no cost to Contractor all such leaks which occur within

Mechanical Special Conditions 15010-12

NYC-WTC_000165172

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165172Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →