NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165171
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Batterj^ark City Commercial Center Bldg. 'B' WTC River Water Intake System Relocations

E. Approval of any submitted data or shop drawings for material, equipment apparatus, devices, arrangement and layout shall not relieve Subcontractor from re­ sponsibility of furnishing same of proper dimensions and weight, capacities, sizes, quantity, quality and installation details to efficiently perform the re­ quirements and intent of the Contract. Such approval shall not relieve the Subcontractor from responsibili­ ty for errors, omissions or inadequacies of any sort on submitted data or shop drawings. F. Each shop drawing to contain job title and reference to the applicable drawing and specification article. G. Within fifteen (15). days after award of Contract, sub­ mit for approval, a list of all material and equipment manufacturers whose products are proposed, as well as names of all Subcontractors whom this Trade proposes to employ. H. Within three (3) weeks after award of Contract, submit a list of all shop drawings which will be submitted in the course of the project. List to show disposition of each item, including date of submission, approval, and the like. List to be kept up-to-date throughout entire construction period. 1. Submit shop drawings and manufacturer's data for the following items in accordance with the Contract Docu­ ments: 1. Coordinated, detailed shop layout drawings of all services and distribution systems, including plans, profiles and sections. 2c Location and size of related piles, concrete platforms, manholes, and other foundations and supports. 3. Schedule of pipe and fittings, materials and application. 4- Details of piping supports, elbows, manholes con­ nections to existing piping, anchors, thrust blocks, and miscellaneous appurtenances. 5. Sacrificial anodes and cathodic protection.

Mechanical Special Conditions 15010-11

NYC-WTC_000165171

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165171Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →