Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165156
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

D. CONCRETE HANDLING & PLACING 1. Foundations Concrete for pile caps, scabs, beams, girders retaining walls and miscellaneous member's shall- be placed in the dry. Before placing any concrete ail equipment for mixing and transporting the concrete shall be clean, all debris and ice shall be removed from the spaces to be occupied by the concrete and the reinforcement thoroughly cleaned of ice or other deleterious coatings. All accumulated water shall be removed from the place of deposit before concrete is placed. Dropping of concrete through water will not be permitted.

2. The Subcontractor's attention is drawn to the expected difficulty involved in transporting materials across the aforementioned utility lines by truck unless a temporary bridge is installed. E. REINFORCEMENT 1.. The Subcontractor shall prespare and submit shop drawings of bar reinforcement for the Contractor’s approval in accord­ ance with the requirements of the General Conditions. Such drawings shall show; the element identification, bending dic-- grams, cutting, lists, inserts, spacers etc. and shall completely demonstrate the location, size, spacing, length and bending of the bar reinforcement. Shop drawings for concrete reinforcement shall be prepared i.n accordance with the American Concrete Institute "Manual of Standard Practice for Detailing Reinforced Concrete Structures", ACI-315. 2. Reinforcing cages for each element shall be completely assembled and securely tied and braced so as to maintain dimensional rigidity during placing of concrete.

F. FORMS Forms shall conform to the shape, lines and dimensions of the elements shown on the Contract Drawings and shall be substantially free from surface defects and sufficiently tight to prevent leakage of mortar. They shall be properly braced so as to maintain position and shape during the placing of concrete. Forms shall meet the requirements of ACI-341-68, "Recommended Practice for Concrete, work", and ACI-SP No. 4, "Formwork for Concrete".

BPC-COMMERCIAL CENTER 03315-5 FOUNDATION CONCRETE CUL-DE-SAC

NYC-WTC_000165156

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165156Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →