NYC 9/11 Public Portal Document
BATTERY PARK CITY
OOM’ERCIAI. CIOTER
CUIz-DD-SAC
■ EARITttvORK
SBCTIOI 02200 •
I. GENERAL
A. DESCRIPTICN
1. The Work covered in this division of the Specificatioi?s
includes the construction described in tlris Paragraph A, including all
labor necessary to perform and ccaplete such construction, all materials
and equipment incorporated or to be incorporated in such construction
and all services, facilities, tools and equipment necessary or used to
perform and ccmplete such construction-.
a. Excavate and rcugh grade surface to the elevations
noted on drawings for each portion of the Wark.
b. Provide Uarperary .sheeting and support as required
for excavation.
c. Transport, and dispose of all materials as further
specified in this Section,
d. Dev^ater and drain as required. The Subcontractor's
attention is drawn bo the expecte<i difficvilty. involved in transporting
materials across the aforementioned, utility lines by truck unless a
teirporary bridge is installed.
B. RELATED WORK NOT INCUJDED IN THIS SECTION BUT SPECIFIED
Rr.qnxiHKRF.
1. The following relate xttafts are specified in other
Sections of the Specifications.
a. Alteration - Section 02110
b. Steel Piling - Section 02310
c. Foundation Concrete - Section 03315
II. PRODUCTS
A. All materials of whatever nature including recent sand,, metal,
fill, timber boulders, debris, or revek encountered within the boundaries
of the Work.and the Excavation subgrades indicated on tlie drawings shall
be unclassified excavation and sriall be’ removed, transported and
disposed of as specified in this Section.
BPC-COMMERCIAL CENTER 02200-1
EARTHWORK
NYC-WTC_000165143
OCR can misread numbers and units. Confirm readings against the page image before using them.