Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165234
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park Cit^B Commercial Center Bldg. "B" WTC River Water Intake System Relocations J. 5KV Splices 1. Splices shall be disconnectable type, 600-Amp modular splices as manufactured by Amerace-Esna Corp., Elastimold Division or an approved equal. In addition, each splice shall be covered with a heat shrinkable tubing. . 2. Heat shrinkable tubing shall be either irradiated modified polyvinyl-chloride or irradiated modi­ fied polyolefin as manufactured by; a. Alpha Wire Corporation b. Belden Mfg. Co. c. Electronized Chemicals Corporation d. Icore Electro Plastics Inc. e. . Penntube Plastics Co., Inc. f. Rayclad Tubes, Inc. g. Mac Products, Inc. K. Emergency Generators Electrical Sub-Contractor’ shall furnish emergency generators and distribution equipment for tempo­ rary power to pump house as shown on Drawings. 2. Emergency generators shall be 900 KW each, 277/480 volts, 3 phase, 4 wire. One unit shall be standby. 3. Provide automatic transfer switch, transform­ er (s), distribution equipment, etc., as shown on plans. 4, No splicing of conduit runs being relocated will be permitted until all temporary power equipment has been installed unless otherwise directed by Port Authority Architect. Temporary power shall be connected to the pump station before any interconnection of new and existing cables, duct banks, etc. will be permitted. 5. Sub-contractor shall furnish all necessary fuel oil and tanks and provide an on-site electrician for duration of temporary power.

Electrical Work 16020-24

NYC-WTC_000165234

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165234Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →