Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165235
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park City Commercial Center Bldg. "B” WTC River Water Intake System Relocations

6. All temporary pcv’er equipment including gener­ ators, transformer(s), distribution equipment, etc., shall become the property of the Sub-con- tractor upon completion of the work of this Con­ tract. 7. The temporary electrical power distribution in­ stallation, powered by the diesel, generator, shall be tested in the presence of the WTC repre­ sentative before connections to the pump station equipment will be permitted. Test shall include use of dummy load banks. 8. All labor required to staff and service both the temporary power distribution system and the power generating system shall be furnished by the Elec­ trical Subcontractor. m• installation, and execotiom A. No shutdowns will be permitted without written approv­ al of Port Authority Architect. Electrical Subcon- tractorcshall assume that shutdowns will take place on Sundays. All necessary overtime shall be included in Sub-Contractor’s bid. B. Where work is to be performed- in existing manholes. the Electrical Sub-contractor shall include cost of pumping water from manholes. C. All new manholes, conduit banks, etc., shall be in­ stalled in place to the greatest extent practicable prior to the disconnection or interruption of power to the pump house in order to minimize outage times. D. Subsequent to the completion of the electrical work, certain cooling water lines will be installed in close proximity to the electric ducts and manholes. Elec­ trical Sub-Contractor shall closely maintain all clearances. E. Sub-contractor shall submit Shop Drawings showing di­ mensioned routing with sections and profiles of elec­ trical runs a minimum of 30 days prior to installa­ tion.

Electrical Work 16020-25

NYC-WTC_000165235

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165235Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →