NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
NYC-WTC_000164671–000164730
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
f DUST PROTECTION AND SUPPRESSION PLAN
• If possible, pump accumulated wash water from wash containment area into a settling tank(s) with baffle(s) to promote separation of oils, sediment/debris, and water. - As needed for reuse or discharge, pump water from discharge side of settling tank through a five (5) micron, in-line, filter. - If possible, use electric pumps. - If generators or gas pumps are used, they should be placed in secondary containment with oil absorbent material and fire extinguisher readily available. - Removal of sediment from tank can be accomplished with the use of sludge vacuum pump (e.g., vacuum truck). • If a settling tank is not used, accumulated wash water should be pumped through a non-woven filter bag that is place in a contained area adjacent to the wash/decontamination station. - Filtered water should then be checked for hydrocarbon contamination (e.g., sheen or odor). If fuel/oil contamination is identified, oil absorbent material/boom should be used to remove contamination and these materials disposed of properly. - As needed for reuse or discharge, pump water through a five (5) micron, in-line, filter. - Filter bag should be taken to disposal site once sediment capacity has been reached. • If wash water is not filtered, it should only be discharged into a sanitary sewer or water tankers for transport to an approved disposal site. • If possible, debris/sediment from wash/decontamination station should be stockpiled in an adjacent contained area to allow saturated sediment/debris to drain prior to being loaded into haul trucks and transported to disposal site(s). If draining of saturated sediment/debris is not possible, trucks transporting saturated material should have dump bed liners to contain liquids during transport to disposal site(s). 4.4 Personal Protective Measures Personnel involved in wash/decontamination station activities will be responsible for removing accumulated dust from vehicles leaving the work area and ensuring loads are properly wet down or covered. Consequently, they will be exposed to dust, wet conditions, and debris/sediments and should use the following measures to help protect themselves against possible hazards: • Head covering • Approved dust mask • Face shield • Rubber gloves • Water repellent outer clothing • Rubber boots
When returning home, wash/decontamination station workers should follow the recommended protection measures described above in Section 2.3, Returning Home.
9/27/01 Page 5 of 5 FINAL
NYC-WTC_000164729
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
24 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
17 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000142247
Generic DEP form from Box 06 with illegible content regarding environmental services.
11 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
24 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
33 shared non-person entities · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149199
Department of Environmental Protection advisory letter dated October 25, 2001, addressed to residents of Lower Manhattan.
18 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145345
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
33 shared non-person entities · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
13 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
15 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
15 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153096
Interagency memo circulating EPA revisions for NESHAP and related programs with request for legal and agency comments.
14 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000124224
Letter from Brookfield requesting approval to open 1 Liberty Plaza for occupancy on October 22, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer