Multi-agency coordination matrix distribution, July 2002

Machine-extracted title · confidence 70%

EPA distribution of inter-agency coordination matrix to federal, state, and local agencies regarding post-9/11 environmental response.

NYC-WTC_000163947–000163966

Folder label: “E-mails M. Gilsenan 2002

Page image
Scanned page image, NYC-WTC_000163956
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

4. The right to receive, inspect and acceptor reject any work. ■ 2 2 • C. tOttalifleatioag ■ .• w2 2 2 - Proof of qualifications must be presenter! upon request, including qualifications for wipe sampling, personal monitoring and HVAC evaluations.

Project Monitors * The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. The Project Monitors musfhave served as a third party project monitor on at least 29 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement / projeets. The Project Monitor must have access to translation services to schedule pre-cleaning unit inspections with residents. ■

Technicisos 2 f Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APS!') certifieates. Techfiicians must have performed air sampling for at least 6 months.

S ampling Parameters Methods ’ 1. Asbestos NIOSH Methods 7400 & 7402. 2. Total Metals - EPA Method SA .-846 601 OB 3. M ercuiy EPA Method SW-8-fo 7471A

P. Specifications ■ (.'lean-up activities shall be scheduled for 20 units per d;n. Air sampling shall be scheduled and completed in these units within 24 hours of successful visual inspection by the Project Monitor. Air sampling shall also be provided at 10 to 20 units where cieai i - up activities are not scheduled. Sufficient personnel shall be available for project monitoring and sampling.

file eoniractor shall have available sunicienl quantities of sampling equipment to ptwide the amount and i)pe of samples inquired for this project. At aasinimnm the following equipment is required: air-sampling pumps with maximum flow rate capacities of 15 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester fillers having pore size of 0.8um.

The Monitoring (fontractor shall prepatva I lealthand Safety Plan (HASP) iflnGCordance witli 29CFR 1910.1001 and 29 CFR1926.58. All persomel. involved in residential cleaning and monitoring activities shal 1 follow the Health and Safety Plan (11 ASP) prep^ared by their employer. EPA shall be provided with a copy of the employer H ASP prior to the start of work.

The Prqect Monitor shall attend a kick offmeeting prior to eonimenceffiat ofsampling activities. At this tiifte, the Contractor shall, but not limited to,^participate in scope ofwork discussions, sampling logistics, obtain resources for residential infonnation provided by EPA and DEF, and demonstrate data acquisition procedures and software. '

NYC-WTC_000163956

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000163956Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →