hours of coflipletion of evaluation.
Deliverables
The PrqjectWnitor shall review all deliverahles prior to subniissionte EPA. The review shall assure
that each deliverable is accurate and complete, technically sound, and free of clerical errors.
The Project Monitor shall record all post-cleaning information in the EPA Indoor Air database or
an agreed upon electronic fonnat. This infennation shall include but, not limited to sampling technique
(aggressive or modified aggressive), visually cleaned (Y/N). damage claim A). anti post clean-up
status (pass/feil). Dates and times shall be associated with all actix ities including start and finish date.
Additional infennation shall be recorded include not limited m absence ot'dusi/debris. equipment
used (leafbiower, fan etc.), size of space, start and completion dates for the cknming, sample media,
flowmediatype, flow rates (start/final, flow rate (au?rage)/I iinc fsiart/fmish). Total elapsed time
(min), Calculated sample volume (L), Pump fault, weather, units, QC samples (lotblanlt) sampling
dates, sample IDs, complete chain of custody, EPA Project Tracking Numbers and laboratory
address shall be entered into an agreed upon electronic fonnat or website approved by 1 IP A within
24 hours ofactivity. Dates and times shall be associated with all activities including start and finish
date.