Deliverables
The Project Monitor shall review all deliverables prior to submission to EPA. The review shall
assure that each deliverable is accurate and complete, technically sound, and free of clerical
errors.
The Project Monitor shall record all post-cleaning information in the EPA Indoor Air database
or an agreed upon electronic format. This include but, not limited to
I'his information shall id
sampling technique (aggressive or modified aggressive), visually ’/N), damage claim
(Y/N), and post clean-up status (pass/fail). Dates and times sb ssociated with al
activities including start and finish date. llllll
Additional information shall be recorded include not limited to absence of dust/debris,
equipment used (leaf blower, fan etc.), size of space, start and completion dates for the
cleaning, sample media, flow media type;, flow rates (start/final, flow rate (average), Time
(start/finish). Total elapsed time (min). Calculated sample v c (L), Pump fault, weather,
units, QC samples (lot blank) sampling dates, sample IDs, ( ilelc chain of custody, EPA
Project Tracking Numbers and laboratory : shall be enter pinto an agreed upon
electronic format or website approved by EP. b24 hours of a( ivity. Dates and times
shall be associated with all activities i nish date.