NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 43/E-mails M. Gilsenan 2002
Document / 19 pages

Revised scopes of work for cleaning and monitoring, July 2002

Machine-extracted title · confidence 88%

EPA transmits revised statements of work for WTC cleaning and monitoring activities incorporating modifications and additions discussed in interagency meeting.

NYC-WTC_000163864–000163882

Folder label: “E-mails M. Gilsenan 2002

Page image
Scanned page image, NYC-WTC_000163876
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

with National Air Duct Cleaners Association (NADC A) General Specification for the CIeaningA>f Commercial Heating, Ventilatiag and Air Conditiotting Systems and NADCA Assessment, Cleaning and Restoration Standard (AGR 2002). Qualified personnel shall perform the HVAC evaluation and cleanliness iiispections. At a minimum such personnel shall have an understanding of HVAC system design, and experiencein utilizing accepted indoor environmental sampling practices, current industry HVAC cleaning procedures, and applicable industry standards.

Deliverables

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall assure that eachdeliverable is accurate and complete, technically sound, and free ofclerical errors.

The Proj ect Monitor shall record if the H V AC systems have been evaluated and cleaned, impact from dust/debris. Ifyes, when and by whom? This information shall be provided viaF2Loran agreed upon alternative electronic format or website approved by EP A witiiin 24 hours ofactivity.

4. in the event that mold is observed in a residence during the pre-cleaning inspection, the Monitoring Contractor will contact the NYC DOH and EPA.

Deliverables

The Proj ect Monitor shall record if mold is present and notify the NYGDOH and EPA. This information shall be provided via EPA Indoor Air web database or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity. •

5. The Project Monitor shall schedule and oversee the cleaning operations ofthe Cleaning Contractor. No residential common space or HVAC system shall be cleaned until the exterior ofthe building has been cleaned or approved by EPA. Ifa schedulingproblem arises the Project Monitor should contact EPA. The Project Monitor shall coordinate daily access for cleaning and sampling with residents, owners, the Cleaning Contractor and sampling technicians.

6. The Monitoring Contractor shall provide sufficient personnel to provide periodic (3-4hours/unit) overs ight ofthe Cleaning Contractor to verify that work is being conducted in accordance with the Cleaning Contact Scope of Work.

7. The Project Monitor shall verify that the Cleaning Contractor is using properly trained and certified NYSDOL and NYCDEP certified workers.

8. The Proj ect Monitor shall conduct routine quality assurance inspections during the course ofcleaning and concur by initialing the Cleaning Checklist (to be developed) fortasks completed satisfactorily.

NYC-WTC_000163876

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000163876Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →