NYC 9/11 Public Portal Document
with National Air Duct Cleaners Association (NADC A) General Specification for the
CIeaningA>f Commercial Heating, Ventilatiag and Air Conditiotting Systems and
NADCA Assessment, Cleaning and Restoration Standard (AGR 2002). Qualified
personnel shall perform the HVAC evaluation and cleanliness iiispections. At a minimum
such personnel shall have an understanding of HVAC system design, and experiencein
utilizing accepted indoor environmental sampling practices, current industry HVAC
cleaning procedures, and applicable industry standards.
Deliverables
The Project Monitor shall review all deliverables prior to submission to EPA. The review shall
assure that eachdeliverable is accurate and complete, technically sound, and free ofclerical errors.
The Proj ect Monitor shall record if the H V AC systems have been evaluated and cleaned, impact
from dust/debris. Ifyes, when and by whom? This information shall be provided viaF2Loran
agreed upon alternative electronic format or website approved by EP A witiiin 24 hours ofactivity.
4. in the event that mold is observed in a residence during the pre-cleaning inspection, the Monitoring
Contractor will contact the NYC DOH and EPA.
Deliverables
The Proj ect Monitor shall record if mold is present and notify the NYGDOH and EPA. This
information shall be provided via EPA Indoor Air web database or an agreed upon alternative
electronic format or website approved by EPA within 24 hours of activity. •
5. The Project Monitor shall schedule and oversee the cleaning operations ofthe Cleaning Contractor.
No residential common space or HVAC system shall be cleaned until the exterior ofthe building
has been cleaned or approved by EPA. Ifa schedulingproblem arises the Project Monitor should
contact EPA. The Project Monitor shall coordinate daily access for cleaning and sampling with
residents, owners, the Cleaning Contractor and sampling technicians.
6. The Monitoring Contractor shall provide sufficient personnel to provide periodic (3-4hours/unit)
overs ight ofthe Cleaning Contractor to verify that work is being conducted in accordance with the
Cleaning Contact Scope of Work.
7. The Project Monitor shall verify that the Cleaning Contractor is using properly trained and certified
NYSDOL and NYCDEP certified workers.
8. The Proj ect Monitor shall conduct routine quality assurance inspections during the course ofcleaning
and concur by initialing the Cleaning Checklist (to be developed) fortasks completed satisfactorily.
NYC-WTC_000163876
OCR can misread numbers and units. Confirm readings against the page image before using them.