NYC 9/11 Public Portal Document
pravided); residents with special needs; potential asbestos-type insulation (e.g., fibrous mMerials);
or other circum-stances that ttoy require Aviation from the procedures specified in Scope ofWork.
In consultation with EPA, the Project Monitor will make a determination of the appropriate
Cleaning Contract Scope ofWork (i.©. Scope A or B) to be implemented. This detefininationis
to be made based the descriptiotts incl uded in the Cleaning Contract Scope of Work and best
professional judgement. f ' ■
Deliverables
The Project Monitor shall review all deliverables priorto submission to EPA. The review shall
assure that each deliverable is accurate and complete, technically sound, and free ofelerieal errors.
Data to be input shall include but is not limited to. start and completion dates for cleaning the stunpie
media, flow media type, flow rates (stai't/final, fl()v\ me (average), time (start/'finish). Total elapsed
time (min), Calculated saniple volume (L), pump fan! i. weather, units. QC samples (lot blank)
sampling dates, sample identification numbers, sampling leehnique (aggressive, or modified
aggressive) residential use (commercial'residential). dust (low liigh). mold, residents with special
needs, clean-up method (Scope A or B), wrinei i access authorizations, and identification of areas
to be cleaned.
The Project Monitor shall record all pre-cicaningand pre-inspection infonnaiiontheEPAIndoor
Air database or an^agreed upon electronic limnat.' Ibis infonnation shall include but, »tlimitod to
actual sampling date and time, exterior evaluation (pass/fail), type of HVAC system (central,
individual or none), HV AC impacted (Y/N), occupant present (YZN), written access aUfhorizatioSs
(Y/N), EPA approval (Y/N), space occupied (YAN), mold present (Y/N). Dates and times shall
be associated with all activities including start and finish date.
All deliverables shall be provided in the EPz\ Indoor Air web database via F2L or an agreed upon
alternative electronic format or website approved by EPA within 24 hQurs of aetivit^^
3. 'fhe Monitoring contractorshall evaluate all 11VA(’ systems in all residential buildings where cleaning
will take place to determine if these systems havebeen impacted by dust or debris froni^thfi collapse
of the World Trade Center and if these systems require cleaning. Incases where cleaning is
requested for a whole building, fte bttildings'HVAC system willWewalttated as a whole.
In cases where cleaning is reqnestedftrtadividiial residential unit, portions of the HVAC
system dedicated to that unit will be evaluated. No residential or conamon space shall be
cleaned until the HVAC system, has been evaluated and cleaned as necessary.
The Monitoring •contractor shall inspect HVAC systems or portions Oereof'Cleaned to
verify deanliBess. ; ■ - • ■ 2
HVAC assessments, cleattiflg, and ■ cleaaliness mspeetions be coadiictedM aecordance
NYC-WTC_000163875
OCR can misread numbers and units. Confirm readings against the page image before using them.