NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 11 pages

Site inspections and dust sampling (Draft 7/2/02)

Machine-extracted title · confidence 37%

Site inspections, surveys, and coordination for dust/debris cleanup.

NYC-WTC_000363017–000363027
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

minimum such personnel shall have an understanding of HVAC system design, and experience in utilizing accepted indoor environmental sampling practices, current industry HVAC cleaning procedures, and applicable industry standards.

Deliverables

The Project Monitor shall review all deli verables prior to submission to EPA. The review shall assure that each deliverable is accurate and complete, technically sound, and free of clerical errors. ii

The Project Monitor shall record if the HVAC systems have been cv and cleaned, 1% • i I • impact from dust/debris. If yes, when and by whom? This infoimation; pcovided via F2L or an agreed upon alternative electrc nic format or website approvi 'A within 24 hours of activity.

8. In the event that mold is observed in a residence during leaning inspection, the Monitoring Contractor will contact the NYCDOH and EP. b-.

Deliverables it’

The Project Monitor shall record if mold i§, iresent and notify the NYCDOH and EPA. This information shall be provided via EPA Int ir Air web database or an agreed upon alternative electronic foimat or website approved bj 'EPA within 24 hours of activity. Iw' .-a|J

9. The Project Monitor shall schedule and oversee the cleaning operations of the Cleaning Contractor, fSfo residentia ■ ion space or HVAC system shall be cleaned until the exterior ofthebuildiing has been |,pr approved by EPA . If a scheduling problem arises the Projeci Monitor should ci A. The Project Monitor shall coordinate daily access for cleaning am Ugg with residents, owners, the Cleaning Contractor and sampling technicians. II ’ll 10. The Monitoring | antractor shall provide sufficient personnel to provide periodic (3- Ill 4hours/unit) overs ;ht of the Cleaning Contractor to verify that work is being conducted in accordance v/iththe Cleaning Contact Scope of Work. Jilt

11. ThePn t Monitor shall verify that the Cleaning Contractor is using properly trained and YSDOL and NYCDEP certified workers.

12. The Project Monitor shall conduct routine quality assurance inspections during the course of cleaning and concur by initialing the Cleaning Checklist (to be developed) for tasks completed satisfactorily.

Deliverables

CITY_21MC100_000439035 NYC-WTC_000363021

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363021Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140306 · Box DEP Box 05

Procedures for obtaining work authorization, monitoring residential and HVAC cleaning, and reporting hazardous conditions to EPA.

Similar indexed content

NYC-WTC_000140537 · Box DEP Box 05

Draft scope of work document detailing compliance requirements and procedures for residential cleaning and air sampling south of Canal Street.

Similar indexed content

Compare copies and versions →