NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 11 pages

Site inspections and dust sampling (Draft 7/2/02)

Machine-extracted title · confidence 37%

Site inspections, surveys, and coordination for dust/debris cleanup.

NYC-WTC_000363017–000363027
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall assure that each deliverable is accurate and complete, technically sound, and free of clerical errors.

The Project monitor shall submit the comfileted Cleaning Checklist via F2L or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

iF" J3. The Project Monitor shall perform a final visual inspections upon com ion of the cleaning. If all areas are not dust free then the Project Monitor will direct the C jung Contractor to reclean as necessary. If all areas are dust free then the Project Monitor 1 authorize final air sampling. Final inspections shall be doc jmenled using the Gleaning

Deliverables SB si

The Project Monitor shall review all deliverables prior to st jission to EPA. The review shall assure that each deliverable is accurate and complete, hnically sound, and free of clerical errors. ■k The Project Monitor shall submit uponrecuesi lies of the log book pages via email. fax, or alternative format agreed upon.

14. The Project Monitor will conduct a post-cleaning inspection of the apartment with the resident at the completion of the sampling. 1 he reindent should inspect the apartment and identify any damage al this time and sign-off on the Project Completion Form. Any damage or loss to an apartment or its contents shall be documtmted on this form. ........................... Deliverables lb WM*.

The Project Moni 1 review all deliverables prior to submission to EPA. The review shall assure thatl iverable is accurate and complete, technically sound, and free of clerical errors. ilW ill

The Project Monitor shall submit upon request to the EPA copies of the log book as requested via fax or alternative format agreed upon and within two days of request. Final air sampling shall be performed with 24 hours of final visual inspection.

15. The Project Monitor will complete a daily report which documents cleaning starts, continuations completions, air sampling and any delays or difficulties encountered.

Deliverables

The Project Monitor shall review all deliverables prior to submission to EPA. The review

CITY_21MC100_000439036 NYC-WTC_000363022

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363022Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140306 · Box DEP Box 05

Procedures for obtaining work authorization, monitoring residential and HVAC cleaning, and reporting hazardous conditions to EPA.

Similar indexed content

NYC-WTC_000140537 · Box DEP Box 05

Draft scope of work document detailing compliance requirements and procedures for residential cleaning and air sampling south of Canal Street.

Similar indexed content

Compare copies and versions →