NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 11 pages

Site inspections and dust sampling (Draft 7/2/02)

Machine-extracted title · confidence 37%

Site inspections, surveys, and coordination for dust/debris cleanup.

NYC-WTC_000363017–000363027
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

shall assure that each deliverable is accurate and complete, technically sound, and free of clerical errors.

The Project monitor shall submit upon recuest the completed Project Completion Form to the into the EPA Indoor Air web database or an agreed upon alternative electronic format or website approved by EPA within 24 houi's of activity.

16. EPA will notify residents and owners of results of sampling condi as ]part of this project. No other party is authorized to release residential or common ing results.

17. Copies of all reports, Cleaning Checklist, Project Completion ft in of custody "OS forms shall be submitted daily to the HiW and DEP. 'W

18. Personal Air Monitoring w ir IB Personal air monitoring shall be performed by the P Contractor in accordance with USDOL OSHA requirements. The person who coj jling shall possess a valid NYS DOL certiticate. Personal air monitoring will bd^ ormi 1 a minimum of one worker per shift per apartment during for the first 4-6 weeks of cleaning opei ations. This may be extended based on an determination made by EPA, DEP and OSHA. Thereafter personal air monitoring samples will be taken at one sample per quail rant per day. All samples shall be collected and analyzed in accordance with .MOSH 7400 Method for PCM and 7402 for TEM. Analysis of these samples shall be the responsibility' of the Monitoring Contractor. Results of analysis shall be available vnthin 24 ITS of collection. The results of this sampling shall be sent immediately to EPA, DEP, OSHA and the employer. The employer will make these results available to the employees or their designated representatives for their review in accordance with 29 CFR1910.1001 and 29 CFR 1926.58.

Deliverables

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall assure that each deliverable is accurate and complete, technically sound, and free of clerical errors. JlIP. WllilBlb The Project Monitor shall submit upon reciuest a field package consisting of field sheets, field notes (copy), and chain-of-custody forms (copy) shall be delivered to the EPA via email, or an alternative format agreed upon. The Contractor must sign and date all field sheets, field logbooks and chain-of-custody forms. This data shall be provided daily upon request at the actixity completion.

19. ing without cleaning

a. Based on consultation with resident or owner, aggressive or modified aggressive air sampling will be conducted. Residents shall not be present in their apartment during aggressive air sampling activities. i. Before beginning aggressive air sampling, forced air equipment (such as a 1

CITY_21MC100_000439037 NYC-WTC_000363023

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363023Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140306 · Box DEP Box 05

Procedures for obtaining work authorization, monitoring residential and HVAC cleaning, and reporting hazardous conditions to EPA.

Similar indexed content

NYC-WTC_000140537 · Box DEP Box 05

Draft scope of work document detailing compliance requirements and procedures for residential cleaning and air sampling south of Canal Street.

Similar indexed content

Compare copies and versions →