‘ 17. Prior to dismantling work area preparations, clean interior walls of temporary
containments using wet-wiping or HEPA vacuum methods.
18. Occupied areas or common areas in which fan unit cleaning is accomplished, will be
cleaned as common spaces using the common space unit prices, immediately after the
HVAC cleaning is complete.
19. Place waste and debris into 6 mil polyethylene bags for disposal as asbestos-containing
waste.
20. Perform all duct cleaning work in accordance with local, state and federal regulations.
21. All work will be accomplished by DEP certified Asbestos Handlers.
22. All work will be supervised by a DEP certified Asbestos Handler Supervisor.
23. All work will be overseen by a NADCA certified ASCS or equivalent.
24. Workers will utilize '/a face APR’s equipped with P-100 filters, eye protection and full
body coveralls during the cleaning process.
25. In most cases minimal dust accumulations were observed on components and the system
has been in operation for over a year, large amounts of debris are not expected during
dismantling of the system components. All specified cleaning is being performed after
the installation of negative pressure ventilation equipment and system isolation devices.
The existing dust/debris conditions and required engineering controls for the cleaning
indicate that personal air samples are not expected to exceed 0.1 f/cc. The cleaning
contractor shall collect personal air samples on workers and submit the results of
sampling within 48 hours. Based on the above, the work area will not be considered as
regulated area. In the event large accumulations of dust/debris are observed during the
work or personal air samples exceed 0.1 f/cc work practices and engineering controls will
be reevaluated and revised accordingly.