6 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗HVAC cleaning procedures transmission, Jan 2003
Machine-extracted title · confidence 95%Duplicate transmission of revised HVAC cleaning procedure documents to DEP and EPA staff.
NYC-WTC_000162746–000162753Folder label: “E-mails 2003 M. Gilsenan”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
within the exhaust ventilation system before moving on to the next grille. HEPA vacuum or wet-wipe interior surfaces of the temporary containment prior to dismantling or moving to another location. Place all waste in 6 mil polyethylene bags for disposal as asbestos-containing waste.
14. Clean the bottom of the riser using a HEPA vacuum to collect any debris that has fallen to the bottom.
15. Disengage the local capture system and relocate to another section of the riser or to another riser.
15. Ensure that the occupant space is free of any debris associated with the duct cleaning process. Use HEPA vacuums and/or wet wiping to clean the space, as needed. Place waste and debris into 6 mil polyethylene bags for disposal as asbestos-containing waste.
16. Perform all duct cleaning work in accordance with local, state and federal regulations.
17. All work will be accomplished by a DEP certified Asbestos Handlers.
18. All work will be supervised by a DEP certified Asbestos Handler Supervisor.
19. Workers will utilize inface APR’s equipped with P-100 filters, eye protection and full body coveralls during the cleaning process.
20. In most cases minimal dust accumulations were observed on components and the system has been in operation for over a year, large amounts of debris are not expected during dismantling of the system components. All specified cleaning is being performed after the installation of negative pressure ventilation equipment and system isolation devices. The existing dust/debris conditions and required engineering controls for the cleaning indicate that personal air samples are not expected to exceed 0.1 fZcc. The cleaning contractor shall collect personal air samples on workers and submit the results of sampling within 48 hours. Based on the above, the work area will not be considered as regulated area. In the event large accumulations of dust/debris are observed during the work or personal air samples exceed 0.1 f/cc work practices and engineering controls will be reevaluated and revised accordingly.
NYC-WTC_000162753
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000162721
Transmission of revised cleaning procedure documents for exhaust and ventilation systems at the World Trade Center site.
6 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162731
EPA submits detailed technical questions and comments on proposed HVAC cleaning procedures for WTC buildings.
5 shared non-person entities · Same agency, volume and box · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000140014
Technical specifications for the application of encapsulant coatings on ventilation system components, including safety and material requirements.
1 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140013
Technical specifications for the application of encapsulant coatings on ventilation system components.
4 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140027
Technical guidance on maintaining air velocity and negative pressure during duct cleaning, HEPA device specifications, and dust containment methods.
3 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140026
Draft cleaning protocol specifying isolation techniques, vacuum collection methods, HEPA equipment use, and contamination control procedures for ventilation ducts.
4 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140511
Draft document outlining regulations and assistance programs for residential cleaning following the World Trade Center collapse.
4 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140517
Departmental comments and requests for clarification regarding cleaning triggers, clearance levels, and supervision requirements.
4 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
4 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097177
Permit application requesting licensed asbestos contractors to clean debris and dust from the interior of 125 Cedar Street.
4 shared non-person entities · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162721
Transmission of revised cleaning procedure documents for exhaust and ventilation systems at the World Trade Center site.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140026
Draft cleaning protocol specifying isolation techniques, vacuum collection methods, HEPA equipment use, and contamination control procedures for ventilation ducts.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135765
City receiving report acknowledging delivery of HVAC consulting services for WTC from TAMS Consultants Inc.
Similarity score 0.972 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135765
City receiving report acknowledging delivery of HVAC consulting services for WTC from TAMS Consultants Inc.
Similarity score 0.964 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000162712
Official notice instructing staff to preserve scanned World Trade Center documents as potential evidence in future legal actions.
Filed in the same folder
NYC-WTC_000162713
Official notice instructing staff not to dispose of original World Trade Center documents as they are required for legal proceedings.
Filed in the same folder
NYC-WTC_000162721
Transmission of revised cleaning procedure documents for exhaust and ventilation systems at the World Trade Center site.
Filed in the same folder
NYC-WTC_000162729
DEP submits OSHA compliance justification document for review regarding worker safety in WTC cleanup procedures.
Filed in the same folder
NYC-WTC_000162731
EPA submits detailed technical questions and comments on proposed HVAC cleaning procedures for WTC buildings.
Filed in the same folder