NYC 9/11 Public Portal Document
1. The OSC has the authority to stop workfor health and safety reasons orfor non-compliance
with the Scope of Work
2. The OSC has the authority to direct the contractor in the performance ofthe work.
3. The OSC has the authority to review and approve or disapprove ofthe qualifications ofall
contractorpersonnel involved in the work.
4. The OSC has the right to inspect and accept or reject any work.
[Input DEP Roles and Responsibilities for contract officer and project manager]
ications
All work shall be performed by a NYS DOL licensed contractor with NYS DOL- and NYC DEP-
certified workers. Proof of qualifications must be presented upon request.
D. Specifipafinns
This contract shall be in force for 18 consecutive months from the commencement date. Contractors
must be prepared to mobilize within 72 hours of the contract award. Contractors shall provide a
sufficient crew size to clean 20 units simultaneously and complete the clean up activities within each
unit within 2 days. A minimum of twenty (20) units shall be cleaned simultaneously. Activities
shall be coordinated with the project monitor to ensure that the visual inspection is performed within
two hours of the completion of clean-up activities. Post clean-up air sampling shall be completed
within 24-hours of the completion of clean-up activities. Cleaning activities shall be considered
completed after the Project Monitor has determined that the cleanup criteria has been met. Copies
of all invoices for work conducted under this contract shall be provided to USEPA and DEP.
The contractor shall prepare aHealth and Safety Plan (HASP) in with 29CFR1910.1020 and 29 CFR
1926.58. All personnel involved in residential cleaning activities shall follow the contractor HASP
prepared by their employer. EPA shall be provided with a copy of the employer HASP prior to the
start of work. Individuals performing clean up activities may wear personal protective equipment
or respirators in accordance with their employers health and safety plan. All cleanup operations will
be conducted in accordance with either Scope A or Scope B as described below.
Scope of Work A
Application: These procedures apply to the clean-up of minimal dust accumulations (light coating).
If a visual inspection indicates the presence of significant accumulations of dust and/or debris from
the collapse of the WTC Scope B procedures shall applied (refer to Scope of Work B). Residents
may be present during Scope A cleaning procedures. If resident chooses not be present, liability
issues must be addressed with the Cleaning Contractor, (needs legal input on specific language).
5. Cleaning of Common Spaces
Common spaces will be cleaned if requested by the building owner or determined necessary
2
NYC-WTC_000161169
OCR can misread numbers and units. Confirm readings against the page image before using them.