1. The OSC has the authority to stop workfor health and safety reasons orfor non-compliance
with the Scope of Work.
2. The OSC has the authority to direct the contractor in the performance ofthe work.
3. The OSC has the authority to review and approve or disapprove ofthe qualifications ofall
contractor personnel involved in the work.
4. The OSC has the right to inspect and accept or reject any work.
[Input DEP Roles and Responsibilities for contract officer and project manager]
C. Qualifications
All work shall be performed by a NYS DOL licensed contractor with NYS DOL- and NYC DEP-
certified workers. Proof of qualifications must be presented upon request.
D. Specifications
This contract shall be in force for 18 consecutive months fi-om the commencement date. Contractors must
be prepared to mobilize within 72 hours ofthe contract award. Contractors shall provide a sufficient crew
size to clean 20 units simultaneously and complete the clean up activities within each unit within 2 days. A
minimum oftwenty (20) units shall be cleaned simultaneously. Activities shall be coordinated with the
proj ect monitor to ensure that the visual inspection is performed within two hours ofthe completion of
clean-up activities. Post clean-up air sampling shall be completed within 24-hours ofthe completion of
clean-up activities. Cleaning activities shall be considered completed after the Project Monitor has
determined that the cleanup criteria has been met. Copies ofall invoices for work conducted under this
contract shall be provided to USEPA and DEP.
The contractor shall prepare a Health and Safety Plan (HASP) in with 29CFR1910.1020 and 29 CFR
1926.58. All personnel involved in residential cleaning activities shall follow the contractor HASP prepared
by their employer. EPA shall be provided with a copy ofthe employer HASP prior to the start ofwork.
Individuals performing clean up activities may wear personal protective equipment or respirators in
accordance with their employers health and safety plan. All cleanup operations will be conducted in
accordance with either Scope A or Scope B as described below.
Scope of Work A
Application: These procedures apply to the clean-up ofminimal dust accumulations (light coating). Ifa
visual inspection indicates the presence ofsignificant accumulations ofdust and/or debris Ifom the collapse
ofthe WTC Scope B procedures shall applied (refer to Scope of Work B). Residents maybe present
during Scope A cleaning procedures. Ifresident chooses not be present, liability issues must be addressed
with the Cleaning Contractor, (needs legal input on specific language).