Memo on water main additions and retaining wall project, May

Machine-extracted title · confidence 95%

Correspondence regarding water main replacements at a site with a street cave-in and retaining wall scope sketches.

NYC-WTC_000159253–000159282

Folder label: “PUBLIC AFFAIRS INQUIRY

Page image
Scanned page image, NYC-WTC_000159275
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document 03/18/2024 68:48 212-669-4980 ” 4 ’ + REPLACE THE ENTIRE RETAINING WALL AND CONSTRUCT NEW PARAPET, + REPLACEMENT WALL, WILL BE REINFORCED CONCRETE MODULAR WALL WITH ARCHITECTURAL FINISH RESEMBLING EXTETING APPRARANGE. * REPLACE SIDEWALK Alt (NFAG TED ROADWAY PAVEMENT WITHIN PROJECT LIMITS. * REPLACE WATER BAIN, _s Perey ver As OR TRAL © ES wh Les * ESTIMATED COST FOR FULL REPLAGEMENT S$ APPROXIMATELY $3.0 MILLION. * ESTIMATED CONSTRUCTION DURATION IS 18 MONTM. + ANTISPATED START OF CCINSTRUCTION IN FALL 2043 oe cag este! say oa eS “ot ae PAGE 18/25 NYC-WTC_000159275

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000159275Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →