Preliminary scope of work document for cleaning 114 Liberty Street,

Machine-extracted title · confidence 95%

Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.

NYC-WTC_000155525–000155603

Folder label: “114 LIBERTY 2 OF 2

Page image
Scanned page image, NYC-WTC_000155534
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

December 17, 2002 114 LIBERTY STREET REMOVAL OF DUST, DEBRIS, AND CONTAMINATED MATERIALS

3.02 STANDARD OPERATING PROCEDURES: A. The Contractor shall develop and implement a written standard procedure for contaminated dust and debris removal to ensure maximum protection and safeguard from aerosol exposure of the workers, visitors, employees, general public, and the environment. The standard operating procedures, which shall be reviewed and approved by the Owner and Ambient Group prior to implementation, shall include:

1. Security from unauthorized entry into the workspace.

2. Restriction of the Contractor's personnel to the immediate work area and access/egress routes.

3. Proper protective clothing and respiratory protection for Work Area Workers prior to entering the work space from the outside.

4. Safe work practices in the Work Area.

5. Proper exit practices from the work space to the outside through the decontamination facilities.

6. Packing, loading, transporting, and disposing of contaminated material in a way that minimizes exposure and contamination.

7. Emergency evacuation procedure for medical and safety.

8. Compliance with safety procedures as reasonably required by the Owner.

9. Provisions for effective supervision and personnel monitoring for exposure during the work.

10. Engineering control systems that minimize exposure to aerosols within and outside the workspace.

3.03 SUMMARY OF WORK:

A, The scope of the Project includes the complete removal and disposal of all contaminated materials located within the demised premises on each floor, including core and shell building improvements, at 114 Liberty Street. It is the intent of this project to remove the aforementioned dust, debris and contaminated materials (including furnishings) from the demised tenant premises and demolish and remoxe tenant improvements and betterments and base-building furnishes, including but not limited to HVAC units and associated ductwork, carpeting, gypsum wall and ceiling board, exposed hardwood flooring, pipe insulation, spray-on fireproofing etc.

B. The contractor shall file this work as an asbestos abatement project with all appropriate agencies, including alt applicable fees.

C. The starting and completion dates for all work, including meeting clearance criteria, shall be determined by 114 Liberty Street Condominium Board and conveyed to the Contractor, prior to the bid due date.

6 © AMBIENT GROUP, INC.-2002 SUMMARY OF WORK

NYC-WTC_000155534

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000155534Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →