NYC 9/11 Public Portal Document
Jun 14 '02 10:35 P.Ol
City of New York Department of Design and Construction
WTC EMERGENCY PROJECT
\j6ne 13, 2002
Environmental Health and Safety Protocol 06-1
HANDLING OF WTC RECOVERY MATERIAL
FROM 130 LIBERTY STREET
130 Liberty sustained damage as a result of the World Trade Center towers attacks on
September 11.2001. As a result of Jie collapse if the towers, materials were deposited on
several floors in the building. Tb-re was an initial search of the material by uniform services
and Ultimately the building was relumed to the owner, Deutsche Bank. Recently, human
remains were identified in materials loc ited at 90 West Street, Based on this discovery,
FDNY requested to re-enter buildings along Liberty Street. Several buildings were re-entered
and the remaining WTC recovery materials in those buildings were searched. As part of this
process, a scope of work was developed for 130 Liberty.
After the property at 130 Liberty was returned to Deutsche Bank, the bank began evaluating
their property using environmental consultants. Preliminary testing was conducted and as a
result of FDNY’s interest in certain areas of the building, Deutsche Bank conducted additional
testing of the WTC recovery material. The results of the environmental sampling are attached
to this protocol.
Removal of WTC recovery materials in outlying buildings to the WTC Emergency site has
been handled in accordance with the WTC Emergency Project Environmental Safety and
Health Plan, Revision 1, February 7,2002. This protocol applies to Bevis Lend Lease (BLL)
employees, subcontractors, and other WTC recovery personnel performing WTC recovery
material removal from 130 Liberty Street, as a continuation of work activities associated with
the WTC Emergency Project, In order to accommodate concerns of Deutsche Bank, this
protocol was prepared. At the same time, Deutsche Bank has filed with NYC DEP an
Asbestos Project Notification for additional work in the building not related to the removal of
recovery materials. These are two separate projects and this protocol does not apply to work
covered under the notification.
Medical Surveillance
■ No special medical surveillance requirements specific to this protocol exist beyond the
need for respiratory medical qualifications and fit testing associated with the use of
negative pressure air-purifying half-mask respirators.
Safety Protocols are considered a part of the WTC Emergency Project ESH Plan.
Page i
NYC-WTC_000154706
OCR can misread numbers and units. Confirm readings against the page image before using them.