WTC Emergency Response Inspection Log, Sept 23, 2001

Machine-extracted title · confidence 95%

Log of environmental inspections conducted at specific buildings near the World Trade Center on September 23, 2001.

NYC-WTC_000154565–000154571

Folder label: “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church

Page image
Scanned page image, NYC-WTC_000154567
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

World Trade Center Emergency Response Inspections conducted on September 24,2001 - Carlstien Lutchmedial

100 Church Street - At the building 1 met two workers who identified themselves as employees sub contracted by Global Crossing (telephone Company) to run a generator to keep their switching gear in operation. They said that the room they occupied on the first floor was cleaned by their company. Also that the owner made them sign a waiver of all liabilities before they could occupy the space. I was unable to locate any building rep on site.

99 Church Street - on site was Robert Ryan and Tadeusz Lukasik handler supervisor # 80809 of Pinnacle Environmental Corp, they said that they were doing a complete interior cleaning of all 11 floors. They had already completed the exterior of the building. A worker decon was set up on the first floor. Inspection revealed that most of the floors were completed. ATC was on site conducting air monitoring. Ryan was informed to send the final clearance to DEP.

90 Church Street - met Postal Police officer Bellamy in front of the building. He said that there was no one in the building. I went into the lobby an noticed that power had not been restored to this building. Bellamy said that from time to time a crew comes in and removes mails from the building.

222 Broadway - Clean-up already completed at this building.

170 Broadway - Clean-up already completed at this building.

88 Greenwich/19 Rector St. - Clean-up of exterior being done by Pinnacle Environmental. Work is expected to be completed today.

Battery Park -South Tower next to American Express Building clean in progress.

40 Rector Street- Met with Joe Attanasio of Milro Restoration (516) 379-6100. He said they were hired by the owner to clean the entire building. His company was not an asbestos company. No air monitoring was being done. At this time they had just started work on the 8* floor.

NYC-WTC_000154567

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154567Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →