should (sic) results were in excess of J % Chrysotile asbestos, the
results rangedfrom 1.30% to 30.80%. The three samples that were
not above J% were detectfor Chrysotile asbestos. These samples
were taken from wind braces and girders that were suspected to
contain asbestos. The samples were split samples with Bovis’s
asbestos abatement contractor. Restdts of the contractor samples are
not yet available.
The situation reports also noted the presences of asbestos-containing material and
the operation of another abatement project in April 2002. According to the
April 5, 2002, Situation Report, bulk testing showed that one sample of the pipe
wrap that was being removed as part of this abatement contained 66 percent
amosite asbestos.
Removal of Debris From Site
In an effort to minimize potential exposure to dust from the transportation of
WTC to the Fresh Kills Landfill, City. State and Federal agencies established
procedures for vehicles transporting this debris. These procedures required
among other measures that tarps be placed over the vehicles and that the vehicles
be wet down at a wet down station. The wet down station was operated by
contractors of the EPA. The volume of truck traffic during the peak period was
very large, thus presenting a challenge to insure that the procedures worked
properly. In addition, the weather conditions, particularly in the winter and the
high temperature of some of the debris also presented challenges to overcome in
insuring the process worked properly.
Particularly in the weeks immediately following the disaster, trucks hauling debris
from the site did not consistently stop to be wetted down before leaving the site.
This problem was recognized by the City and the City instituted measures to
enhance compliance. City agencies, around October 12. 2001. began issuing
summonses for failure to secure loads or to stop to be wet down. As many as 300
summonses were issued by the City. The City also enlisted the assistance of the
New York State Department of Environmental Conservation Police, assisted by
the National Guard, to enforce the requirement to stop at the wet down stations. As
a result, assistance was obtained from the New York Police Department to-ensure
that trucks stopped-at-the wash-stations befor-e leaving the-site; Even after this.
truck.swithextremelyhotdcbris gettingPoliceDepartraentassistaneeto-ensure
that-true-k-s-stopped-at-the-washing station;-EPA Situation Reports-indiceted that
the-trucks-weredid not stopping long enough to get completely wetted down.
EPA Situation Reports indicated that as late as October 13, 2001, this was still a
problem. However, by the end of October 2001 to the beginning of November
2001. the problem was solved and almost 100% of the trucks were stopping at the
wet down stations for a proper wet down. This success can be attributed to the
cooperation of the City. State and Federal agencies and to the capability of the
EPA contractor in dealing with various technical problems.
NYC-WTC_000153086
OCR can misread numbers and units. Confirm readings against the page image before using them.