NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 26/No folder label
Document / 8 pages

EPA NESHAP excerpts coordination memo, July 2003

Machine-extracted title · confidence 65%

Forwarded memo distributing excerpts from EPA NESHAP document to NYC agencies for informational purposes.

NYC-WTC_000153081–000153088
Page image
Scanned page image, NYC-WTC_000153085
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

The demolition of all WTC complex buildings to ground level was completed by late December 2001. WTC 4 and WTC 5 were brought down using a weight .susp.ende.d.b.y..a.cabl.e,.by-wFe6king-ballsr Section 27-1039d of the New York City B.uilding Code This method of bHnging dovt'n -a build-ing re.quired. apprayal of the Department of Buildings to use this method of demolition. The Department was consulted and he concurred in the use of this method.had been outlawed in New York-for over- two decades,-but-an exception was granted under-the special e-iFeumstances-t-hat-ex-isted-after-the terForist- attack-.- WTC 6 was brought down using mechanical grapplers and cutting shears. A photo of a grappler is attached at Appendix . with “special-remote cutting shears-. --

Both -NYCDDG-and-DSHA-officiak-told us tbat iThc WTC site was under continuous dust suppression. (If this is not acceptable then we suggest as an alternative “EPA officials were at the site and observed that the site was under continuous dust suppression.”) In addition to the general dust suppression activities on the haulways, the daily incident plan detailed areas of the WTC site where work was to take place and focused dust suppression activities would be needed. OSHA officials told us that this dust suppression was very successful, and that two minutes after demolition you could see across the space where the buildings had been. They Although OSHA officials further stated that it would have been too dangerous to send abatement contractors into WTC 4, WTC 5, or WTC 6 to remove asbestos-containing material before demolition,, there was no need to do this as there was no asbestos-containing material above ground in these buildings,.

Treatment of Asbestos-Containing Materials

Both NYCDDC and EPA officials told us that when asbestos-containing material (e.g., pipe wrapping, steel insulation) was encountered during the removal, it was tested and treated in accordance with asbestos abatement procedures. According to the NYCDDC official, the majority of the asbestos-containing material was encountered when removing the remnants of the basement levels of WTC 6,^ betewThe-^urry-wail-:

EPA Situation Reports confirmed the NYCDDC official’s statement about asbestos abatements at the site. The reports recorded instances where asbestos was found during debris removal and asbestos abatements performed. For example, the EPA May 23, 2002, situation report noted that;

Twelve (J2) bulk asbestos samples were taken in the BJ, B2, B3, levels of (WTC) Building 6. The samples were taken from sprayed on insulation at the request ofNYC DOI. Cf the twelve samples, nine (9)

NYC-WTC_000153085

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000153085Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →