The demolition of all WTC complex buildings to ground level was completed by
late December 2001. WTC 4 and WTC 5 were brought down using a weight
.susp.ende.d.b.y..a.cabl.e,.by-wFe6king-ballsr Section 27-1039d of the New York City
B.uilding Code This method of bHnging dovt'n -a build-ing re.quired. apprayal of the
Department of Buildings to use this method of demolition. The Department was
consulted and he concurred in the use of this method.had been outlawed in New
York-for over- two decades,-but-an exception was granted under-the special
e-iFeumstances-t-hat-ex-isted-after-the terForist- attack-.- WTC 6 was brought down
using mechanical grapplers and cutting shears. A photo of a grappler is attached
at Appendix . with “special-remote cutting shears-. --
Both -NYCDDG-and-DSHA-officiak-told us tbat iThc WTC site was under
continuous dust suppression. (If this is not acceptable then we suggest as an
alternative “EPA officials were at the site and observed that the site was under
continuous dust suppression.”) In addition to the general dust suppression
activities on the haulways, the daily incident plan detailed areas of the WTC site
where work was to take place and focused dust suppression activities would be
needed. OSHA officials told us that this dust suppression was very successful,
and that two minutes after demolition you could see across the space where the
buildings had been. They Although OSHA officials further stated that it would
have been too dangerous to send abatement contractors into WTC 4, WTC 5, or
WTC 6 to remove asbestos-containing material before demolition,, there was no
need to do this as there was no asbestos-containing material above ground in these
buildings,.
Treatment of Asbestos-Containing Materials
Both NYCDDC and EPA officials told us that when asbestos-containing material
(e.g., pipe wrapping, steel insulation) was encountered during the removal, it was
tested and treated in accordance with asbestos abatement procedures. According
to the NYCDDC official, the majority of the asbestos-containing material was
encountered when removing the remnants of the basement levels of WTC 6,^
betewThe-^urry-wail-:
EPA Situation Reports confirmed the NYCDDC official’s statement about
asbestos abatements at the site. The reports recorded instances where asbestos
was found during debris removal and asbestos abatements performed. For
example, the EPA May 23, 2002, situation report noted that;
Twelve (J2) bulk asbestos samples were taken in the BJ, B2, B3,
levels of (WTC) Building 6. The samples were taken from sprayed on
insulation at the request ofNYC DOI. Cf the twelve samples, nine (9)