The demolition of all WTC complex buildings to ground level was completed by
late December 2001. WTC 4 and WTC 5 were brought down using a vertical
impact system similar to a pile driver.by wrecking-balls. Section 27-1039d of the
New York City Building Code This method of bringing down a building required
aEEIoy£lLQ£the_BorougJi£pmmissionnJ2flheDepaj1men^
method of demolition. The appropriate borough commissoner was consulted and
he concurred in the use of this method.had been (wdaw-ed in New York for over
two deeades-; -but- an-exeeption was granted under the special circum-sta-nees that
e-x-i-sted-a-ft&Hbe4errorist attack. WTC 6 was brought down using mechanical
grapplers and cutting shears. A photo of a grappler is attached at Appendix
.with “special remote cutting-shears.”
Both NYCDDC and OSHA officials told us that -tThe WTC site was under
continuous dust suppression.(If this is not acceptable then we suggest as an
alternative “EPA officials were at the site and observed that the site was under
continuous dust suppression.” OSHA officials told us that this dust suppression
was very successful, and that two minutes after demolition you could see across
the space where the buildings had been. They Although OSHA officials further
stated that it would have been too dangerous to send abatement contractors into
WTC 4, WTC 5, or WTC 6 to remove asbestos-containing material before
demolition, there was no need to do this as there was no asbestos-containing
material above ground in these buildings.T
Treatment of Asbestos-Containing Materiais
Both NYCDDC and EPA officials told us that when asbestos-containing material
(e.g., pipe wrapping, steel insulation) was encountered during the removal, it was
tested and treated in accordance with asbestos abatement procedures. According
to the NYCDDC official, the majority of the asbestos-containing material was
encountered when removing the remnants of the basement levels of WTC 6^
below the slurry wall.
EPA Situation Reports confirmed the NYCDDC official’s statement about
asbestos abatements at the site. The reports recorded instances where asbestos
was found during debris removal and asbestos abatements performed. For
example, the EPA May 23, 2002, situation report noted that:
Twelve (12) bulk asbestos samples were taken in the Bl, B2, B3,
levels of(WTC) Building 6. The samples were taken from sprayed on
insulation at the request of NYC DOI. Of the twelve samples, nine (9)
should (sic) results were in excess of 1% Chrysotile asbestos, the
results rangedfrom 1.30% to 30.80%. The three samples that were
not above 1% were detectfor Chrysotile asbestos. These samples
NYC-WTC_000153481