NYC 9/11 Public Portal Document
were taken from wind braces and girders that were suspected to
contain asbestos. The samples were split samples with Bovis’s
asbestos abatement contractor. Results of the contractor samples are
not yet available.
The situation reports also noted the presences of asbestos-containing material and
the operation of another abatement project in April 2002. According to the
April 5, 2002, Situation Report, bulk testing showed that one sample of the pipe
wrap that was being removed as part of this abatement contained 66 percent
amosite asbestos.
Removal of Debris From Site
In an effort to minimize potential exposine to dust from the transportation of
WTC to the Fresh Kills Landfill, City, State and Federal agencies;? ineludine the
EPA-established procedures for vehicles transporting this debris. These
procedures required among other measures that tarps be placed over the vehicles
and that the vehicles be wet down at a wet down station. The wet down station
was operated by contractors of the EPA. The volume of truck traffic during the
peak period was very large amounting to over 1000 trucks per day thus presenting
a challenge to insure that the procedures worked properly. In addition, the
weather conditions, particularly in the winter and the high temperature of some of
the debris also presented challenges to overcome in insuring the process worked
properly.
Particularly in the weeks immediately following the disaster, trucks hauling debris
from the site did not consistently stop to be wetted down before leaving the site.
This problem was recognized by the City and the City instituted measui-es to
enhance compliance. City agencies around October 12, 2001, began issuing
summonses for failure to stop to be wet down. As many as 300 summonses were
issued by the City, on October 12, 2001. The City also enlisted the assistance of
the New York State Department of Environmental Conservation Police, assisted
by the National Guard, to enforce the requirement to stop at the wet down
stations. As a result, assistance was obtained from the New York Police
Department to ensure that trucks stopped at the wash stations-before leaving the
she? Even after this, trucks with extremely hot debrisgetting Police Department
assistance to ensure that trucks stopped at the washing station^ EPA Situation
Reports-indicated-that-the-trucks-were^ not stopping long enough to get
completely wetted down. EPA Situation Reports indicated that as late as October
13, 2001, this was still a problem. However, by the end of October 2001 to the
beginning of November 2001, the problem was solved and almost 100% of the
trucks were stopping at the wet down stations for a proper wet down. This
success can be attributed to the cooperation of the City, State and Federal
agencies and to the capability of the EPA contractor in dealing with various
technical problems.
NYC-WTC_000153109
OCR can misread numbers and units. Confirm readings against the page image before using them.