Bid Withdrawal Approval for Roof Remediation, Apr 2002

Machine-extracted title · confidence 95%

Letter granting Safeway Corp's request to withdraw their bid for Contract ROF-REM1 due to a substantial omission of work.

NYC-WTC_000151251–000151252

Folder label: “CONTRACTS CONTRACTORS - See: $ matrics etc file

Page image
Scanned page image, NYC-WTC_000151251
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

To: Contract ROF-REMl File From: Stuart M. Erdfarb, P.g^^

Department of Environmental Date: April 15,2002 Protection S9-17 Junction Boulevard Re: Contract ROF-REMl Flushing, New York Withdrawal of Bid Due to Error 11373-5108 Safeway Environmental Corp.

On April 10,2002, bids were opened for Contract ROF-REMl, for the Christopher O. Ward EMERGENCY ROOFTOP AND FACADE REMEDIATION AT THE WORLD TRADE Commissioner CENTER SITE (the “Contract”). Ten bids were submitted. The low bidder, with a bid of $547,337.50, was Safeway Environmental Corp. (“Safeway”). The engineer’s estimate for the Contract was $3,303,000, and the next lowest bid, submitted by Fiber Control, Inc. was Stuart M. Erdfarb, P.E. $1,287,337.50. The average of the ten bids is $2,651,918. When the low AOENCY CHEF CONTRACnNQ OFFICER bid is eliminated, the average increases to $2,885,761. This is a unit price Td (718)696-3300 contract. Fax (718) 696-3278 [email protected] In a letter to the Department, dated April 10,2002, Safeway stated that it had based its bid on cleaning only theJront of the affected buildings, when in fact, the Contract calls for the cleaning of each side of the buildings. According to Safeway, its unit prices for this work omitted a substantial quantity of work, i.e. the cost of suspending scaffolding for cleaning the sides and backs of the buildings. In a follow-up letter, dated April 11, 2002, Safeway explained that it used $.96 per square foot instead of $3.09 per square foot of cleaning. Safeway unintentionally omitted a substantial quantity of work in the compilation of its bid.

Pursuant to §3-02(m)(3)(iii) of the Procurement Policy Board Rules, I, as Agency Chief Contracting Officer, approve the withdrawal of the bid submitted by Safeway based on the following:

the mistake was made known the Agency within three days of the opening of the bids; and.

the price bid was based on an error of such magnitude that enforcement would be unconscionable;

the bid was submitted in good faith, and the bidder submitted credible evidence that the mistake was an inadvertent omission, as opposed to a judgement error; and.

( www.nyc.go»Zdep~)

(718J OEP-HELP

NYC-WTC_000151251

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000151251Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000151127 · Box DEP Box 11

A notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of due to potential legal actions.

Filed in the same folder

NYC-WTC_000151141 · Box DEP Box 11

Letter confirming contractor responsibility for cleaning residences and HVAC systems in accordance with project scope.

Filed in the same folder

Compare copies and versions →