NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 10/DEP COMMISSIONER DAILY REPORTS
Document / 209 pages

Legal hold notice for WTC documents, undated

Machine-extracted title · confidence 100%

Notice instructing staff to preserve original World Trade Center documents for potential legal actions against the City.

NYC-WTC_000148742–000148950

Folder label: “DEP COMMISSIONER DAILY REPORTS

Page image
Scanned page image, NYC-WTC_000148801
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

4 Financial Center 4 Inspection of building revealed eentamination of lobby areas, restaurant and several bars. Some windows blown out on facade facing south. Will put outside areas on list for cleanup as priority. Building owner responsible for all inside areas, facade and roof top. Building management has all ready secured perimeter of building and has begun cleanup work.

Greenwich to Bdway between chambers and Murray

Cleanup work was completed on 9/26/01 at OSOOhours in the area from Greenwich to Broadway, between Chambers and Murray. Advised feat Construction company is responsible to insure no emissions from vehicles occur. At minimum, all loads must be substantially wet down, covered with tarps, and vehicles washed. Air monitoring was conducted in this arva to maintain deorance levels. Four air samples were taken in the proposed area each day. AU four samples passed clearance level. These results were as follows:

10/2/01 Park Place and church .007 fibers/cc Park Place and Greenwich .008 fibers/cc Murray and Church .007 fibers/cc Murray and Greenwich .008 fibers/cc

DOH Received draft vehicle advisory as promised from DOH. Made comments and returned.

First Response

First Response personnel Fawzy and Haas made entry with FDNY and ESU into a new un chartered area in the southwest corridor below the trade center. DEF provided real time monitoring for vital support g inthcenvirSHSimt and took air and water samples for further analysis. Investigation of the stability of the slurry wall was performed by Sim river. Additionally, air and water samples were taken to check for R22 refrigerant. An attempt was made by rafts to try to get through a flooded area to the freon tanks to assess there condition but was unsuccessful because of debri in the pathway. ♦ Analytical lab results indicate fee presence of sea water in fee samples. The FDNY Office of Chief Bob Ingraham has been notified of fee results.

The daily ground zero monitoring for dangerous gases showed nonnal background levels.

NYC-WTC_000148801

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000148801Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

DEP WTC General Correspondence Form · Box DEP Box 10

NYC-WTC_000149798

Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.

30 shared non-person entities · Same agency, volume and box · similarity 0.971

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →