NYC 9/11 Public Portal Document
DEP LEGAL AFFAIRS
Fax:17185956543
Jul 7 2003
9:11
P.11
An NYCDDC official told us that they had been advised by the Port Authority
that as for the two towers, one tower was built without asbestos and the second
tower had been built with asbestos fire-proofing up to approximarely the 40th
floor. Further. the Port Authority had advised that it had initiated a program
following the 1993 bombing to remove asbestos related materials where
present,ane removed aceessible asbestos containing matarial from the WTC
buildings prior to September 11. In addition. City officials were advised by the
Port Authority and General Services Administration that-Tthere was no asbestos
containing-material in the above ground portions of WTC Buildings 4. 5 and 6.
However, asbestos-containing material was found in the gårage strucmure arez at
the WTC site.. City offfeiets teld us that the City's Aobestes Control Pregram
tules die net apply because of the emsergeney situation. White EPA and New
York State asbestos NESHAP regulations require that a notification be filed even
in emergency situations.. N Naotification of a NESHAP demolition and removal
operation was not filed for the WTC demolition and removal of WTC buildings 4,
5and 6 because City officials were advised by the property owner and one of the
larger tenants. which happened to be a Federal agency, that there was no asbestos
in the above ground structures._. Althoued this tecbnical roguiremeRt was net
mettn any event, throughout the WTC site.. Droper planning was taken in the
removal of asbestos-containing material and-as set forth below proper
procedures were followed in remoying any asbestos-containing material, which
were below grade, and to minimize exposure to asbestos-containing material.
Hoalth and safety meetings were held every day to plan to deal with, among other
things. removal of asbestos-containing material. A number of City, State, and
Federal agencies, including OSHA, DEC, FEMA, EPA, USACE, and DEP, as
well as the construction managers and Bechtel participated in these
meetings.Fhese-mestings were a collaberative effort among a number of Citt
Stato-and Federal agencies, including the EPA. All participantsagencies,
including ERA--contributed their expertise and collaboratively played a role in
the decision making at these meetings. These meetings discussed among other
things conceming semoval of asbestos-containing material, and the adequate
wetting down.of thie material. Procedures for removal of the material were
continuously revised considering the location and nature of the material and any
other issues affecting removal. Aiso, in this regard, a site safety plan was created
to address issues such as the removal of asbestos-containing material. All
agencies, including the EPA reviewed this plan and had input into the fina!
version of the plan. As set forth below proper procedures zocluaiing measures fo
insure adequate wetting down of asbestos-containing material were taken. City
officials told tis that the Cityis Asbestos Control Program fules did not apply
becsuse of the erergeney situatien. Further, a NYCDDC officiat tele 4s that the
Port Authority had romered acecssibte asbestos-containing material froen the.
WTC buildings pxior to September 17. Consequently, it his view asbestos wes
not a primary coneert-in the demolition.