An NYCPDC official told us that they had been advised by the Port Authority
that as for the two towers, one tower was built without asbestos and the second
tower had been built with asbestos fire-proofing up to approximately the
floor. Further, the Port Authority had advised that it had initiated a program
following the 1993 bombing to remove asbestos related materials where
present.had removed accessible asbestos-containing material from the WTC
buildings prior to September 11. In addition. City officials were advised by the
Port Authority and General Services Administration that -Tthere was no asbestos
containing-material in the above ground portions of WTC Buildings 4, 5 and 6.
However, asbestos-containing material was found in the garage structure area at
the WTC sitcz. City officials told us that the City’s Asbestos Control Program
rules did not apply because of the emer; situation.- While EPA and New
York State asbestos NESHAP regulations require that a notification be filed even
in emergency situations.r-NJ^notification of a NESHAP demolition and removal
operation was not filed for the WT€-demolition and removal of WTC buildings 4,
5 and 6 because City officials were advised by the property owner and one of the
larger tenants, which happened to be a Federal agency, that there was no asbestos
in the above ground structures. . Although this-technical requirement-was not
metin any event, throughout the WTC site,, proper planning was taken in the
removal of asbestos-containing material and as set forth below- proper
procedures were followed in removing any asbestos-containing material, which
were below grade, and to minimize exposure to asbestos-containing material-
Health and safety meetings were held every day to plan to deal with, among other
things, removal of asbestos-containing material. A number of City, State, and
Federal agencies, including OSHA, DEC, FEMA, EPA, USACE, and PEP, as
well as the construction managers and Bechtel participated in these
meetings.These meetings were a collaborative effort among a number of Cit-y-^
State and Federal agencies, including the-fiP-A. All participantsagencies,
including EPA, -contributed their expertise and collaboratively played a role in
the decision making at these meetings. These meetings discussed among other
things concerning removal of asbestos-containing materiah and the adequate
wetting down of the material. Procedures for removal of tlie material were
continuously revised considering the location and nature of the material and any
other issues affecting removal. Also, in this regard, a site safety plan w-as created
to address issues such as the removal of asbestos-containing material. All
agencies, including the EPA reviewed this plan and had input into the final
version of the plan. As set forth below proper procedures including measures to
insure adequate wetting down of asbestos-containing material were taken.Citv
©ffieiak4old-us-thaf-the-Gity^s-Asbestes-Ge«trol-4h=egFaHH=«les-did-«et^ply
beeause-eTthe-emergeney-situatioft^^WtheFraNYGDDG-effieial-teld-us-that-the
Pert-T^utherityTtad^^effloved-aeeessible-asbestes-eontaifHftg-mateFial-ftem-the
buildings prior to September 11. Gonsequently; in his view asbestes-was
not a primary concern in the demolition.